Laserfiche WebLink
Executive order VR-202-D <br /> Healy Phase II EVR System <br /> Including In-Station (ISD) System <br /> Exhibit 9 <br /> ISD Operability Test Procedure <br /> The following procedures shall be used at field sites to determine the operability of the <br /> Veeder-Root ISD system to satisfy the requirements documented in VAPOR <br /> RECOVERY CERTIFICATION PROCEDURE CP-201 CERTIFICATION <br /> PROCEDURE FOR VAPOR RECOVERY SYSTEMS AT GASOLINE DISPENSING <br /> FACILITIES. Testing the ISD equipment in accordance with this procedure will verify the <br /> equipment's operability for Vapor Containment Monitoring and Vapor Collection <br /> Monitoring. <br /> Veeder-Root's TLS console ISD System Self-Test Monitoring algorithms are designed <br /> to verify proper selection, setup and operation of the TLS console modules and sensors <br /> and will not complete and report passing test results in the event of a failure of <br /> components used in the system. Completed ISD monitoring tests are evidence that: <br /> • The system was properly powered for data collection <br /> • All necessary ISD sensors were setup and connected <br /> • All necessary ISD sensors were operating within specification <br /> • All internal components including TLS console modules were properly setup and <br /> operating within specification <br /> Veeder-Root recommends printing a copy of the ISD ALARM STATUS and ISD DAILY <br /> report (REF. Section 5, Operation of the ISD Install, Setup &Operation Manual) <br /> periodically to determine that compliance tests are being completed in accordance with <br /> local and state regulations. <br /> A step-by-step worksheet for recording data from the following operability tests is <br /> provided at the end of this Exhibit. <br /> Note that districts may require use of an alternate form to meet these requirements, <br /> provided the alternate form includes the same minimum parameters. <br />