Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />JP Tanmwkvy <br />TEST DATE:01/17/07 8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER2246805 <br />CLIENT: 7 -ELEVEN, INC. AUSTIN, TEXAS 78759 (512) 451-6334 SITE 7 -ELEVEN #32190 (N-3810) <br />Tank ID: MUL 5 <br />Product: MIDGRADE <br />Capacity in gallons: 9,684 <br />Diameter in inches: 90.00 <br />Length in inches: 356 <br />Material: DN FIBERG <br />COMMENTS <br />Tank manifolded: <br />No <br />Vent manifolded: <br />No <br />Vapor recovery manifolded: <br />YES <br />Overfill protection: <br />YES <br />Overspill protection: <br />YES <br />Installed: <br />ATG <br />CP installed on: <br />/ / <br />Start (in) <br />End (in) <br />Bottom to grade in inches: <br />Dipped Water Level: <br />Fill pipe length in inches: <br />51.5 <br />Dipped Product Level: <br />4.0 <br />Stage I vapor recovery: <br />Probe Water Level: <br />Stage II vapor recovery: <br />Make: <br />Ingress Detected: Water Bubble <br />Ullage <br />Model: <br />Test time: <br />S/N: <br />Open time in sec: <br />Inclinometer reading: <br />Holding psi: <br />VacuTect Test Type: NOT <br />Resiliency cc: <br />VacuTect Probe Entry Point: TESTS <br />Test leak rate ml/m: <br />Pressure Set Point: <br />Metering psi: <br />Tank water level in inches: <br />Calib.leak in gph: <br />Water table depth in inches: <br />Results: <br />Determined by (method): <br />Result: <br />COMMENTS <br />COMMENTS <br />Material: <br />FLEX <br />Diameter (in): <br />1.5 <br />Length (ft): <br />175.0 <br />Test psi: <br />50 <br />Bleedback cc: <br />170 <br />Test time (min): <br />90 <br />NOT <br />Start time: <br />14:55 <br />TESTED <br />End time: <br />16:25 <br />Final gph: <br />0.006 <br />Result: <br />PASS <br />Pump type: PRESSURE <br />Pump make: FE <br />PETRO <br />COMMENTS <br />Bottom to top fill in inches: <br />141.5 <br />Bottom to grade in inches: <br />152.0 <br />Fill pipe length in inches: <br />51.5 <br />Fill pipe diameter in inches: <br />4.0 <br />Stage I vapor recovery: <br />DUAL <br />Stage II vapor recovery: <br />BALANCE <br />FTA <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />VEEDERROOT <br />ELECTRONIC <br />189.0 <br />3.00 <br />PASS <br />NOT <br />TESTED <br />Impact Valves Operational: YES <br />NOT <br />TESTED <br />NOT <br />TESTED <br />Printed 01/24/2007 09:34 <br />