Laserfiche WebLink
SWRCB, January 2002 <br />Page 2. <br />9. SPILL/OVERFILL CONTAINMENT • c <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />Spill Bucket Manufacturer <br />Other (Specify) <br />Industry Standard <br />Professional Engineer <br />Test Method Used: <br />Pressure <br />Other (Spec) <br />Vacuum <br />Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box# 4 REG FILL Spill Box# 5 MID FILL Spill Box# 6 PRE FILL Spill Box# <br />Bucket Diameter: <br />11 <br />11 <br />11 <br />Bucket Depth: <br />13 <br />13 <br />13 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />13 4 5 <br />1345 <br />1345 <br />Initial Reading (Ri ): <br />10 <br />10 <br />10 <br />Test End Time: <br />1445 <br />1445 <br />1445 <br />Final Reading (RF ): <br />10 <br />10 <br />10 <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (R F - RI) <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />it <br />0 <br />0 <br />Pass <br />L-1 <br />Fail 1-7 <br />pass <br />E] <br />Fail <br />Pass <br />Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />