My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/5/2018 8:21:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X/ D. Alternate construction for new underground storage tanks contai# motor vehicles fuel [Section 26331. <br /> (1) Monitoring and response plan [Section 26341. <br /> /(2) Underground storage tank composed of.... <br /> (a) Fiberglass reinforced plastic. <br /> _ (b) Cathodically protected steel. <br /> (c) Steel clad with fiberglass reinforced plastic. <br /> (d) Other material that complies with section 2631 and 2632. <br /> _ (3) Floor of Leak interception and detection system constructed on a firm base and sloped to a <br /> collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br /> _ (4) Access casings installed in the collection sump of the secondary containment system with <br /> backfill in the interstitial space. The access casing shall meet all of the following: <br /> Designed and installed to allow the Liquid to flow into the casing. <br /> _ Sized to allow removal of collected liquid and able to withstand all anticipated applied <br /> stresses. <br /> Constructed of material that will not be structurally weakened. <br /> Screened along entire vertical zone of permeable material. <br /> Capable of preventing Leakage of any hazardous substance from the casing. <br /> Extend to the ground surface and covered with a locked waterproof cap. <br /> Capable of meeting S.J. Co. PHS-EMD Well Standards. <br /> Leak interception and detection system shall prevent the leaked hazardous substance from <br /> entering ground water. <br /> 14. INTERSTITIAL SPACE MONITORING <br /> A. Visual monitoring [Section 2632 (c) (1)] <br /> _ (a) Exterior surface and floor beneath tank monitored by direct viewing <br /> _✓ (b) Daily visual inspections <br /> (c) Liquid level in tank to be recorded at time of inspection <br /> >/ (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br /> has occurred. <br /> B. Mechanical or electronic monitoring [Section 2632 (c) (2)] <br /> (a) Continuous monitoring system connected to an audible and visual alarm system. <br /> Monitoring equipment to be installed <br /> _✓ Manufacturer: �nAcL— <br /> V/ Model Number: CIT rl y.vL.U <br /> Sensor Type: _ Vapor 1ZLiquid _ Both. <br /> -1/11, <br /> Sensor/Panel specifications. <br /> Location(s) for se ors: <br /> Tank: ✓ Piping: <br /> Dispenser: <br /> C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)]. <br /> 15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 1° tank or <br /> double-wall UST. [Section 2631 (b)]- A. Approved by a nationally recognized independent testing organization. <br /> ✓✓✓/ B. Demonstration of integrity with the primary and/or secondary containment. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.