Laserfiche WebLink
0 <br />P <br />8. a. Describe the method that will be utilized to purge and/or Inert the tank(s): <br />yn( I Ibs �Joo cJ�/w ,off <br />C -C <br />b. TankTipingHauler. <br />Name in <br />Address 3MC,City Zip 3o <br />Phone No.L 6& <br />Hauler Registration / Of hauled as hazardous)_ <br />C. TanMpingDisposal Site: <br />Name Ga <br />Address—7-0o0 r�r.�ve i� City :� . krv5 �z �� ZIP X3307 <br />Phone No.0 GCC ( 1 32--7 _ 35 5-9 — <br />EPA MOoftransported toapermitted TSD IaclDty)_ 6 � <br />9. Is the sampling firm an Independent third party from the contractor? YES U NO [ ) <br />9a. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />SG M Cal. <br />t(�IJ <br />u <br />10. Describe how the excavation Will be backfilled with suitable material upon removal• <br />oW,v, c t s 4c. 0 C.. rt"' .F <br />'9 - <br />II. Handling of excavated soli• <br />a) What material will be used to line the tank pit and cover the stockpile? <br />(hfl <br />b) What will be the final destination of the excavated stockpile? <br />c) Contamluated Sol] Hazardous Waste Hauler. <br />Name Hauler Registration / CA Z g O g'p 3 <br />Address q / 5 1 C3_,6,, of c� City 5c—C rC, vn e ) Zip 95 zy <br />Phone No.( / �2 ) G gyp, q c/V 6 <br />EH 23 049 (Revlsed 08113199) Page 5 <br />