Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />HE Pr --WED <br />Test Method Developed By: F Tank Manufacturer Industry Standard r Professional Engi3pN 06 <br />F Other (Specify) <br />Test Method Used By: r Pressure r vacuum P7 Hydrostatic. INV!Ro. <br />F Other (Specify) nCa+ <br />Test Equipment Used: VPLT <br />Equipment Resolution: 0.00001 in. <br />STP Containment for <br />Tank T4 RUL - 1 <br />STP Containment for <br />Tank T5 MUL - I <br />STP Containment for <br />Tank T6 PUL - I <br />Sump Diameter/Dimensions: <br />48 in. <br />48 in. <br />48 in. <br />in. <br />Sump Depth: <br />70.00 in. <br />70.00 in. <br />70.00 in. <br />in. <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Pivinp, Penetration: <br />1900 <br />2200 <br />20.00 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />1200 <br />1000 <br />12.00 <br />Condition of sump prior to testing: <br />good <br />good <br />good <br />Portion of Sump Tested' <br />21 <br />24 <br />22 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />re Yes f Nor NA <br />fo Yes r Nor NA <br />l* Yes f Nor NA <br />f Yes r Nor NA <br />Turbine shutdown response time <br />02:00:00 sec <br />02:00:00 sec <br />02:00:00 sec <br />sec <br />Is system programmed for fail-safe <br />shutdown?* <br />r; Yes r Nor" NA <br />r Yes f No f NA <br />r Yes f No f NA <br />r Yes f No C NA <br />Was fail-safe verified to be <br />operational?* <br />r Yes r Nor NA <br />r Yes r Nor NA <br />G Yes r Nor NA <br />r- Yes r" Nor NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min <br />5 min <br />5 min <br />min <br />Test Start Time: <br />10:20:00 <br />10:00:00 <br />11:08:00 <br />Initial Reading (Rt): <br />0.00000 in. <br />0.00000 in. <br />0.00000 in. <br />Test End Time: <br />10:50:00 <br />10:30:00 <br />11:38:00 <br />Final Reading (RF): <br />-0.00030 in. <br />-0.00110 in. <br />-0.00010 in. <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -Rt) : <br />-0.00030 in. <br />-0.00110 in. <br />-0.00010 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/-0.00200 <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Was sensor removed for testing? <br />rJ Yes r• Nor" NA <br />G Yes r- No (NA <br />r* Yes r Nor NA <br />ryes rNo r NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />(; yes r Nor NA <br />r: Yes r Nor NA <br />r: Yes r Nor" NA <br />r Yes rNo r NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. <br />W0: 2324875 <br />010 <br />ENTAL <br />rR MNIT <br />