Laserfiche WebLink
• ;-itGEIVEE) <br /> D.Results of Testing/Servicing MAY 0 7 2015 <br /> Software Version Installed: 331.01 <br /> =NVIRONMENTAL <br /> Complete the following checklist: <br /> .� Yes r No* Is the audible alarm operational? <br /> Yes f' No* Is the visual alarm operational? <br /> Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No* Were all sensors installed at lowest point of secondary containment and positioned so[hat other equipment will not Interfere wit <br /> heir proper operation? <br /> Yes No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> Yes No. For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> r N/A stem detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> 11 that appy Sump/Trench Sensors; 01 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?r* Yes; OF No <br /> Yes r No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> 17- N/A so at what percent of tank capacity does the alarm Vi er?90% <br /> FIP Yes* G No LNas any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> anufacturer name and model for all replacement parts in Section E below. <br /> Q Yes* r No as liquid found inside any secondary containment systems designed as dry systems?(Check all that appy) <br /> _ Product 0 Water If es describe causes in Section E below. <br /> Yes f No* as monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes f No* s all monitoring equipment operational per manufacturers specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> Removed less then a cup of water from the 91 STP sump Floor. <br /> Monitoring System Certification Page 2 of 3 12/07 <br />