Laserfiche WebLink
Healy Exhibit 8 U' tlVt:L <br /> Required items in Conducting TP-241.3 MAY 0 4 2015 <br /> (Executive Orders VR-201-M and VR-202-M) <br /> ENVIRONMENTAL <br /> 1jrt1Tr-r nt_OAnrAA'r%i- <br /> The instructions below are required when conducting TP-201.3 for these systems. The tester shall document that each step was <br /> followed as indicated below and shall include this page of the Exhibit with the submission of TP-201.3 test results. Note that <br /> districts may require use of an alternate form to meet these requirements, provided the alternate form includes the same <br /> minimum parameters. <br /> Prior to conducting TP-201.3, all four ball valves on the Healy Clean Air Separator(CAS)shall be closed, as shown in <br /> 1, Figure 1 or Figure 1 H, to isolate it from the Underground Storage Tank(UST)system to permit the pressurization of the <br /> UST system. Figure 1 applies to vertical CAS installations and Figure 1H applies to horizontal CAS installations. <br /> 2 Conducting TP-201.3 with any dispenser piping test valve in the closed position is not permitted. Any dispenser with a <br /> dispenser piping test valve in the closed position while conduction TP-201.3 will bias the test towards compliance. <br /> After conducting TP-201.3, the four ball valces on the Healy Clean Air Seperator(CAS)shall be locked in their normal <br /> 3. operating positions as shown in Figure 2B-2 or 26-21-1, Exhibit 2 of Executive Orders VR-201-M and VR-202-M. Figure 26- <br /> 2 applies to vertical CAS installations and Figure 2B-2H applies to horizontal CAS installations. <br /> Required Steps Verification <br /> 1.All four CAS ball valves closed before conducting TP-201.3 Yes <br /> 2 All dispenser piping test valves open before conducting TP-201.3 Yes <br /> 3.AJI four CAS ball valves in normal operating positions after conducting TP-201.3 Yes <br /> Test Company: TANKNOLOGY INC. Facility Name; 7-ELEVEN#32190, MKT 2368 <br /> Ryan Casey <br /> y 3/19/2015 <br /> Print Name(Technician) Signature Date <br /> 0 9/12/2016 <br /> Technician Certification Number Expiration Date <br /> (ICC or District Training Certification,as applicable) <br /> items Required in Conducting TP-201.3, Exhibit 8- Executive Orders VR-201-M and VR-202-M <br /> V'VO: 2321928A' E(;Ejvj=L) <br /> MAY 0 4 2915 <br /> CNVIRONMENTAI <br />