My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:13 PM
Creation date
11/5/2018 8:25:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2013 TO 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or <br /> Scanoaq Juin Valley HEALTHY AIR LIVING' <br /> wwwlie a I m y a irlivifig.carn <br /> AIR POLLUTION CONTROL DISTRICT Make one change for clean air! <br /> TP 201.3 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number: Test Compary:Tanknology Inc. <br /> Site Name: 7-ELEVEN#32190, MKT 2368 Technician: Ryan Casey <br /> Site Address 4943 S. KINGSLEY(FRONTAGE RD)HWY 99 @ ARCH Certification Number Expiration Date <br /> AIRPORT RD <br /> City: STOCKTON IZip: 95206 District: <br /> Date/Time of Test:3119/2015 1 <br /> TEST INFORMATION <br /> Total number of nozzles 12 lAre the tanks manifolded?17 Yes F No <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) 7TVR 102 <br /> Phase 11 vapor recovery system executive order(as referenced on Permit to Operate) VR 202 <br /> Nitrogen introduction point W Phase I Vapor Coupler F Phase 11 Vapor Riser <br /> Pressure measuring device r Incline Manometer W Digital Manometer Mechanical Gauge <br /> Calibration date for pressure measuring device(must be within 90 days of the test) 2/2512015 <br /> Ending value for digital mancmeter drift test if applicable(must be 0.01 in.w.c. or less) 0.00 <br /> Initial tank ullage pressure(vent if over 0.5 in w.c.) 0.00 <br /> Nitrogen introduction flow rate, F(must be between 1 and 5 CFM) 2.00 <br /> Calculated ullage fill-time, t2(t2=V/1522 x F) 04:24 <br /> Actual fill-time 03:19'00 <br /> lNumber of hoses with over 100 ml(balance hoses must be drained prior to testing) <br /> TANK INFORMATION <br /> Tank No. 4 5 6 ALL <br /> Product grade 87 89 91 <br /> Actual tank capacity(gallons) 14781 9684 9684 34149 <br /> Gasoline volume(gallons) 8843 5811 6091 20745 <br /> Ullage,V(gallons) 5938 3873 1 3593 13404 <br /> If tanks are not manifolded, number of nozzles 12 <br /> 2 IN.W.C.STATIC PRESSURE TEST <br /> Test No 1 2 3 5 <br /> Start time 09:50:00 <br /> Initial Pressure, inches of water column(in.w.c.) 2.00 <br /> Pressure at one minute, in.w.c. 2.00 <br /> Pressure at two minutes,in.w.c. 2.00 <br /> Pressure at three minutes, In.w.c. 1.99 <br /> Pressure at four minutes, in.w.c. 11.99 <br /> Pressure at five minutes,in.w.c. 1-98 <br /> Allowable minimum pressure, in.w.c. 1,92 <br /> Pass/Fail(enter`GF"for gross failure) Pass t I V <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable i e <br /> statements and information provided in the document are true, accurate, and complete. MAY 0 <br /> Signature of Technician: Date: 3/19/20I5 <br /> ILENVIRONMENTAk <br /> WO:2321928 VMQAIrXrA 12VIl <br />
The URL can be used to link to this page
Your browser does not support the video tag.