ARCO Products CompanyJ co co
<br /> Dispenser and Piping ReplacementI ow
<br /> QC �
<br /> 2 O
<br /> vC =
<br /> 7 :> (0
<br /> ° m
<br /> O o
<br /> _ GENERAL NOTES: COMPLIANCE NOTES: DRAWING LIST N
<br /> 6100 NIl,ce 99 - _ (Ll
<br /> A. ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED AS SHOWN ON ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR C
<br /> ARCO TANK DRAWINGS (TK—SERIES) AND ARCO MASTER CONSTRUCTION REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT
<br /> CONDITIONS FOR INSTALLA FIOn:
<br /> SPECIFICATIONS (SECTIONS RELEVANT TO THIS PROJECT). LOCATIONS. T-1 COVER SHEET
<br /> 1 Notitb tiie dept. B. THESE PLANS ARE DIAGRAMATIC IN NATURE AND ARE NOT INTENDED TO ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE C1-1 — DEMOLITION SITE PLAN „
<br /> _ All de�iatiurn hom apps o�ed piano nnut b� upprov�d b� I II4 CIID. BE AN EXACT REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO CA1-1 MISCELLANEOUS SITE DETAILS IZ. : Cd
<br /> Ld
<br /> 3 I'untp Shut Clown must satiSlb all conditions listed in 'I itle 23 CCR 2630 (g). SHALL RELOCATEM MODIFY, OR ADJUST TO PROVIDE A SYSTEM CONSISTANT THE ATTENTION OF THE QWNER'S ENGINEER FOR HIS DECISION BEFORECAt-2 — P,LC. UNIT INSTALLATION
<br /> - Q
<br /> 4 SC ptgc , lot required inspections. WITH THE INTENT OF THE DESIGN. THE GENERAL CONTRACTOR SHALL PREPARE PROCEEDING WITH THE WORK.
<br /> TK-1 — PETROLEUM PIPING PLAN
<br /> i No wen well can be within ISO' of an undel�,round tank. If slater hell exist AS-BUILT PLANS AT THE COMPLETION OF THIS JOB. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF
<br /> on site notify inti itOrS M st p ! TK-2 — DEMOLITION PLAN AT TANK SLAB -
<br /> INDUSTRIAL SAFETY, STATE OF CALIFORNIA , FOR EXCAVATIONS OF TRENCHES
<br /> TK-3 — am m TANK SUMP AND DISPENSER COMPLIANCE
<br /> C. INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS
<br /> G in must the t monitors must per cors ucording to mmn2630 ( s Standards. AND MONITORING EQUIPMENT AS SHOWN ON ELECTRICAL DRAWINGS. ALL 5�-0° OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESEND. �p
<br /> ❑nd must be feared annually m accord , tcc with section 26 i0 (d), Calillxni;I CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED PER N.E.C. (INSTALLATION PLAN
<br /> Code of Regulations (CCR). l itIc 23 W Reis. 1)ivisioil , Chater 16
<br /> . p . AND LOCAL REQUIREMENTS. GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING -
<br /> 7 All corrodible piping it m direct contact with baC6lill motel tel. shall be
<br /> AGENCY PRIOR TO TANK INSTALLATION. TK3-1 — PIPING REPLACEMENT — SUMP & VENT PIPING Cd
<br /> Ill otected ilgEli list corrosion as specified In lisle 23 26.36 (b). Copper piping D. ARCO SHALL PERFORM LINE TESTING AND AIR QUALITY TESTING, INSTALLATION DETAILS
<br /> that nut} be used to drain the vapor pots Lire corrodible piping thereloi it must CONTRACTOR REPRESENTATIVE SHALL BE PRESENT DURING TESTING. TANK SYSTEM TO BE INSPECTED BY GOVERNING AGENCY AND ARCO ENGINEER AT TK3-2 — PIPING REPLACEMENT — SIPHON PIPING
<br /> he isolated I ,,..!!
<br /> FOUR (4) SEPERATE CONSTRUCTION PHASES AS REQUIRED: Wnnis backfill. loping the copper pipe Scill eat meet This E. FENCE. JOB SITE WITH 6 FT. HIGH CHAIN LINK FENCE DURING TK3-3 — PIPING REPLACEMENT — PIPING INSTALLATION J
<br /> i All
<br /> cquipit. CONSTRUCTION. 1.. PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 DETAILS AT MULTI—PRODUCT DISPENSERS
<br /> 3 :AII cyuipntent to be installed mist be CI. listed and compatible with the MINUTES,
<br /> product to be stored ill it. F. UTILIZE EXISTING ELECTRICAL/SIGNAL CONDUIT WHEREVER POSSIBLE. TK3-4 — PIPING REPLACEMENT — TYPICAL MULT-PRODUCT
<br /> 9 Gsisting vent Imes may' be leti in place it they are unco%crcd and inspected by REPLACE/ALTER/INSTALL NEW CONDUIT AS REQUIRED. REPLACE DETERIORATED ` 2.`, INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN
<br /> IiIIU to nmliun flus' Lite col axion protcUcd and sti ucturally :oun<I. Lincs CONDUIT AS REQUIRED. ACCORDANCE WITH MANUFACTURER'S GUIDELINES. DISPENSER INSTALLATION DETAILS
<br /> ' nniSt pass presxnc 4,t ns am n om line, m be replaced tsilh ne,a' piping.
<br /> TK3-5 — PIPING REPLACEMENT — TANK SLAB ANCHORING
<br /> to Sc theL rubber Loots used to test secondary containment pillmist nv'st be G. CONTRACTOR SHALL TOUCH—UP PAINT AS REQUIRED. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION (�ti AND IDENTIFICATION DETAILS W
<br /> "��
<br /> .. slipped away se, that the scunxtruy lines tl rain properly. SYSTEM. -. - � �
<br /> I I Sumps uemd for vapor pots must be til, listed. Proside inform+' ',) H. REPLACE ALL DISPENSER FILTERS UPON JOB COMPLETION. TK4-1 — PIPING REPLACEMENT — VEEDER—ROOT LEAK DETECTION i
<br /> installation of sumps. ALL' TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE AND MPD DISPENSER DIAGRAM W/ BROWN BOX cd Q
<br /> I. ALL IMIPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS NOTED HYDROSTATICALLY TESTED WITH STANDING WATER FOR A' PERIOD OF 24 HOURS .
<br /> I2 Linc Leak Uetechn' test must be witnessed by Irll D. ,%' - OTHERWISE. PROTECT FROM DAMAGE DESTRUCTION. TQ INSURE THAT THAT THE SUMPS ARE WATERTIGHT. THE ARCO FIELD ENGINEER (GILBARCO B79 BASED) --
<br /> 17 All inspection nlnSt he ,ChCdUICd ds hrs in td%'al,e�,,' Musr SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION rEsr CHECKLIST TK4-3 - PIPING REPLACEMENT MATERIAL LIST ABBREVIATIONS 0'
<br /> J. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. BEFORE CONTRACTOR WILL BE PAID. tr *f '
<br /> ENVIP4NMENIAL�HEAIT TANK ORIENTATIONS AND GENERAL NOTES: ■�Y+
<br /> TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS C`
<br /> P.O. Box 388, Stockton,CA 95201-0388 K. INTALL EXPANSION JOINTS (E.J.) AND CONTROL JOINTS (C.J.) IN ALL NEW FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM
<br /> Phone: (209)468-3420 CONCRETE, WORK AS SHOWN AND REQUIRED. 13EING PLACED IN OPERATION.
<br /> LJApproved L. UNDERGROUND WIRING SHALL BE INSTALLED IN THREADED RIGID METAL PIPE AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND
<br /> CL' roved with changes: see Remarks PER N.E.C. 514-8, EXCEPTION NO. 2 PERMITS NON—METALLIC CONDUIT IF APPROVED BY GOVERNING AGENCY PRIOR TO TANK OPERATIONS. —t
<br /> pp
<br /> LiDlsapproved: See Remarks BURIED 24 INCHES DEEP WITH GROUND WIRE AND AT LEAST 24 INCHES OF
<br /> METAL CONDUIT IS INSTALLED UNDERGROUND. EVIDENCE OF FINANCIAL RESPONSIBILTY SHALL BE SUBMITTED TO GOVERNING - 0) Q
<br /> Remarks �9- c c�. 7owS o-/ru� AGENCY. ,3 r�z
<br /> UNDERGROUND•-- - M. ALL UNDERGROUND ELECTRICAL CONDUIT RISERS SHALL BE PVC COATED LLL--/
<br /> RIGID GALVANIZED STEEL TO A DEPTH OF 24 INCHES BELOW GRADE. ALL ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE V Q O ro
<br /> r ELECTRICAIL. CONDUIT BURIED 24 INCHES DEEP SHALL BE SCHEDULE 40 PVC. AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING C. LL. m
<br /> Late �al2h By�°� - AUTHORITIES.
<br /> N. CIRCUIT DISCONNECTS TO OR THROUGH THE DISPENSING PUMP SHALL - Cd J ''
<br /> Approval of these plans extends only to that DISCONNECT ALL CONDUCTORS, INCLUDING ANY GROUNDED CONDUCTORS PER THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE �/ Q a
<br /> which is shown and described hereon b^,, t, N.E.C. 514-5. PRODUCT STORED. - L, Z U o
<br /> does not authorize Or approve, r`
<br /> or deviation of rec�uiremant> of Cte,,, �s6`: "r ill 0. IF STRONG ODOR OF GASOLINE OR DIESEL FUEL IS PRESENT IN EXCAVATED - - = Z U
<br /> Lotai Ordinaneaac. .4� MATERILAS, STOCKPILE CONTAMINATED MATERIALS ON PLASTIC FILM AND COVER _ ro
<br /> WITH SAME. NOTIFY ARCO ENVIRONMENTAL ENGINEERING FOR DISPOSAL. - C^` 0 u
<br /> COORDINATE ALL ENVIRONMENTAL MATTERS WITH: PAUL SUPPLE, ARCO
<br /> ENVIRONMENTAL ENGINEERING. PHONE: (510) 299-8891. PROVIDE ALTERNATE /'1 z YL- �
<br /> BID ITEM: UNIT COST ($/CUBIC YARD) FOR OVER-EXCAVATION WORK. O 0 > 'o
<br /> 0 30 In UO
<br /> N CA
<br /> CA 22
<br /> Z � tnrn 6
<br /> N2 �v . . wUo
<br /> 2moa pW
<br /> U �. y '0 N N O
<br /> ' OON N MI 1
<br /> - master release date -
<br /> NO. DATE REVISIONS PROJECT RELEASE proj. exe drawn by
<br /> PERMIT_
<br /> project / facility
<br /> BID 0595
<br /> CONST. sheet /.. file
<br /> AS BUILT T-1
<br /> .. of .
<br /> AR994/994CVR.DWG .
<br />
|