My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
2300 - Underground Storage Tank Program
>
PR0231612
>
COMPLIANCE INFO_1989-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:31:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2014
RECORD_ID
PR0231612
PE
2381
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\8200\PR0231612\COMPLIANCE INFO 1989-2014 .PDF
QuestysFileName
COMPLIANCE INFO 1989-2014
QuestysRecordDate
10/3/2017 4:26:49 PM
QuestysRecordID
3659124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� • <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name ..? eery F <br /> Facility Address Iv- <br /> A. <br /> ✓A. Describe the frequency of performing the monitoring: <br /> Tank —72)Fl%Lc/ <br /> Piping eco �ec�c�s /l�e� a7i5 XRT <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank <br /> Piping 111?' <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> f <br /> Y <br /> A <br /> E. Reporting format for onitoring: <br /> Tank <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the anufacturers' maintenance schedule <br /> but not less than every 12 months: <br /> G. Descnbe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: Al <br />
The URL can be used to link to this page
Your browser does not support the video tag.