My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
2300 - Underground Storage Tank Program
>
PR0231612
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:54:51 PM
Creation date
11/5/2018 8:34:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0231612
PE
2381
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\8200\PR0231612\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
10/3/2017 4:39:42 PM
QuestysRecordID
3659329
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • e <br /> STATE OF CAUFORMA °� <br /> STATE WATER RESOURCES CONTROL BOARD W v e <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM ��`�""'"�� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 5Z17D R w`7 q? <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK LD.# ca I S. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) vJ—� D. TANK CAPACITY IN GALLON <br /> II.TANK CONTENTS IFA-1 IS MARKED.COMPLETEITEM C. <br /> A. MOTOR VEHICLE FUEL ❑ 4 OIL B. C.� Ia REGUL R 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY1 PRODUCT ❑ lb PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> "`"""ttp UNLEADED 5 JET FUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED 99 OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.0: <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL F7 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ A STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE 7 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL IN <br /> 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED 121,95 UNKNOWN ❑ 99 OTHER <br /> LINING- <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL I YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING I❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A/52 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN p U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 6 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION U UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION Q,5Z AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL <br /> MDNRORNC ED 99 OTHER <br /> V.TANK LEAK DETEC ION <br /> ❑ 1 VISUAL CHECK2 INVENTORY RECONCILIATION E] 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING r7 INTERSTMALMONTTORING ❑ 91 NONE ❑ 95 UNKNOWN 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYHR) I 2.ESTIMATED OUANTTTY OF 3.WAS TANK FILLED WITH YES [:3NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> IPRIYTED 6 SIGNAWRE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE LD.# I <br /> PERMIT NUMBERPERMIT APPROVED BY/DATE )PERMIT EXPIRATION DATE <br /> �3 9S <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION.FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> 0 <br /> FOR00N&0.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.