Laserfiche WebLink
BOARD OF TRUSTEES SA14 JOAQUIN LOCAL HEALTH DISOCT <br /> Jamas Culbertson, Pres. SERVING <br /> Mary Anna Love,vice Pres. 1601 East Hazelton Avenue, P.O. Box 2009 City of Lodl <br /> Patricia E.Vannuccl,Secy. San Joaquin County <br /> Tommy Joyce StocktonCalifornia201 San Joaquin County <br /> , a <br /> Earl Pimentel City of Escalon <br /> Virginia Mathews (209) 466-6781 City of Manteca <br /> Daniel L. Flores City of Ripon <br /> John D.Mast,M.D. Jogl Khanna,M.D.,M.P.N.,District Health OfficerClly of Stockton <br /> City of Tracy <br /> San Joaquin County <br /> Date: May 13, 1988 <br /> REPLY TO: Chevron USA, Inc. <br /> Attn: K. Huffman <br /> 2 Annabel Lane - Suite 200 <br /> San Ramon, CA <br /> RE: 9474 N. HIGHWAY 99; SS/#6155; STOCXTON <br /> PLAN FOR: PRELIMINARY WORK PLAN SUBMITTED BY: GETTLER-RYAN, INC. <br /> FOR: SOIL SAMPLING REQUIREMENTS DUE TO TANK CLOSURE ACTIVITIES CONDUCTED JUNE, <br /> 1986 <br /> Please be advised that this office has reviewed the above referenced Work Plan. We <br /> have found the plan to be adequate provided the following considerations are <br /> addressed. <br /> 1: Section III, page 2: Address how soil cuttings and bailed water <br /> encountered during boring/well construction/sampling shall be containerized and how <br /> these containers will be disposed. All manifests shall be submitted to the San <br /> Joaquin Local Health District within 30 days of disposal. <br /> 2: Section IV, page 4: Identify the specific method(s) to be used in the <br /> soils and water sampling analyses. <br /> 3: Section IV, page 5, Item C: In the event free product is encountered <br /> during boring/well construction, sampling of the municipal well less than 500 feet <br /> to the north of the parcel shall be sampled for EPA 601/602 and the results <br /> included in this Preliminary Assessment Report. <br /> 4: Provide to the San Joaquin Local Health District the following items to <br /> complete the application for monitoring well permit process: a) identify the well <br /> driller contracted to perform the construction and have contractor submit current <br /> licence and proof of current workmen's compensation insurance, b) owner shall sign <br /> and return the enclosed "Authorization to Release Analytical Data" form, and c) <br /> Contractor issued monitoring well permit shall provide a minimum of 48-hour advance <br /> notice for inspection requests. <br /> These issues should be addressed in a revised sampling plan which must be submitted <br /> to this office for approval prior to initiating the work plan. <br /> It should be noted that additional sampling may be necessary should the results of <br /> the sampling effort not adequately define the extent of contamination. <br /> COPY <br />