Laserfiche WebLink
ES TERN GEOLOGIC RESOURCES , INC , <br /> J. Munoz/3 Apr 1989 <br /> 5c' <br /> a <br /> 22 September 1988 - Julian Munoz Safeway <br /> WA transmitted the laboratory reports for soil sampling not includ" <br /> previous reports. These include soil samples collected on 26 and 27 July <br /> 1988 and soil samples not previously reported or discussed, which include <br /> soil samples TP-8 and TP-10 collected on 14 March 1988 and soil samples <br /> TP-23 through TP-27 collected on 31 August and 1 September 1988. The <br /> results are presented in Table 1 and the locations are presented in Figure <br /> ;v 7. TPH were not detected in samples TP-23 through TP-27, except in TP-26 <br /> at 4 ppm. <br /> In a proposal to the SJLHD dated 22 November 1988, PI requested to <br /> backfill a portion of the excavation. Beginning on 12 December 1988, 80% of <br /> the excavation was backfilled, leaving the southern end open for possible <br /> additional work. The facility's fire main was also reconnected. In March <br /> 1989, the storm drain was reconnected. <br /> This summary is presented in order to assemble all information concerning <br /> the tank excavation and stockpile sampling in one document for ease of review <br /> and for evaluation of further steps toward closure of the site. We would <br /> like to discuss, at your earliest convenience, a meeting with regulatory <br /> agencies to establish those additional steps. <br /> We are pleased to provide environmental consulting services to Safeway and <br /> look forward to working with you on this project. <br /> Sincerely, <br /> Western Geologic Resources, Inc. <br /> Kathleen A. Isaacson <br /> Project Hydrogeologist <br /> nw/KAI <br /> cc: Gordon Boggs - California Regional Water Qualitiy Control Board <br /> Central Valley Region <br /> Hardip Ahluwalia - San Joaquin Local Health District <br /> �r <br /> 07611ma9 <br />