My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2941
>
2300 - Underground Storage Tank Program
>
PR0502672
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 1:29:00 PM
Creation date
11/5/2018 9:08:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0502672
PE
2381
FACILITY_ID
FA0005529
FACILITY_NAME
TEXACO USA (ST TERMINAL)
STREET_NUMBER
2941
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2941 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\N\NAVY\2941\PR0502672\COMPLIANCE INFO 1986-2006.PDF
QuestysFileName
COMPLIANCE INFO 1986-2006
QuestysRecordDate
11/3/2017 5:06:19 PM
QuestysRecordID
3716422
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> RETROFIT LOCATIONS <br /> INVENTORY RECONCILIATION - Performed daily by facility operators . <br /> Variations in excess of 100 gallons daily, 5% of thruput but no <br /> greater than 350 gallons weekly and O . 5% of thruput but no less <br /> than 100 gallons monthly will be reported . To improve inventory <br /> reconciliation accuracy, Texaco is installing automatic continuous <br /> tank gauging instrumentation for each tank (Veeder-Root TLS-250/ <br /> literature attached) . Results of inventory reconciliation will <br /> be reported to administering agency quarterly. <br /> TANK TESTING - Tank testing will be performed quartrerly by auto- <br /> matic tank guaging system's leak detect mode which detects leaks <br /> to an accuracy of 0 . 20 gallons per hour (at 24-hour locations , <br /> tanks will be taken out of service for 6 hours per quarter to run <br /> this test ) . Results of tank tests will be reported to administering <br /> agency quarterly. <br /> LINE PRESSURE MONITORING SYSTEM - Pressurized product lines will <br /> be continuously monitored by electronic line pressure monitor <br /> (K & E Associates PMS-800/) which will disable pumps upon pressure <br /> drop in line corresponding to a leak of 0 . 05 gallons per hour . <br /> SPILL CONTAINMENT BOX - Spill containment boxes will be installed <br /> on all fill lines regardless of groundwater depth . <br /> BCN:dc <br /> R211/54X/l <br />
The URL can be used to link to this page
Your browser does not support the video tag.