My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2941
>
2300 - Underground Storage Tank Program
>
PR0503538
>
REMOVAL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 2:22:23 PM
Creation date
11/5/2018 9:11:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1986
RECORD_ID
PR0503538
PE
2381
FACILITY_ID
FA0009657
STREET_NUMBER
2941
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206-1149
APN
48906-1
CURRENT_STATUS
02
SITE_LOCATION
2941 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\N\NAVY\2941\PR0503538\REMOVAL 1986 .PDF
QuestysFileName
REMOVAL 1986
QuestysRecordDate
10/3/2017 5:24:38 PM
QuestysRecordID
3659638
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> BE <br /> v ; JOB SPECIFICATIONS <br /> ff <br /> for <br /> EXXON RTA ADDITIVE TANK MODIFICATIONSr ' NXI) RTA ADDITIVE TANK MODIFICATIONS <br /> 5.5.5 .Testing ��—DRAWINGS <br /> 7 . REFERENCE <br /> (1) All piping andtub Ing shall be hydrostatically tested 1. MANUFACTURERS DRAWINGS AND DETAILS TO BE FURNISHED WITH <br /> with water before any backfill is permitted. EQUIPMENT. <br /> o ,r? <br /> 'fi <br /> (2y Contractor shall install blind flanges,q , skillet blinds 2. TANK VENDER DRAWINGS AND INSTALLATION DETAILS TO BE <br /> ..�j..s ,. <br /> Or plugs of appropriate thickness at locations. as FURNISHED WITH THE TANKS. <br /> directed by , . the. Company's Representativein order to <br /> isolate certain sections from subjection to the <br /> ' hydrostatic test pressure. - NOTE: Contractors will receive, at the time of shipment arrival at <br /> the site, and is to use in the constructions vendor <br /> �'ki( � (3) The piping system then shall be preasyred` to150 psi drawings, sketches and installation instruction for owner <br /> and held for thirty (30) minutes , furnished equipment . (Contact Exxon Engineer for any of <br /> a t,azb, <br /> (4) All tanks shall be tested before they are shipped to the information that may be' needed earlier) . <br /> the site by Exxon ,S Supplier. All further testing in 8 , ADDITIONAL. SPECIFICATIONS FQR THE SPECIFIC SITE <br /> the field is to be performed by the Contractor . <br /> 9,^PeE j 8 .1 See Site Plan for locations, items to be removed and <br /> (5) Following hydrostatic testing all piping shall be installed . <br /> pumped .and drained as .free of water as possible. - <br /> Compressed air shall be - used where . . possible to 8 .2 Listed below are additional specifications for the <br /> forcibly remove any remaining liquid . particular site. <br /> 5.6 Piping and Tubing Material <br /> 5.6 .1 Piping <br /> Pipe shall conform to ASTM A-53 or A-106, Gr . B seamless, <br /> G,;'•,�:, schedule 40 or as shown on the drawings . <br /> 5.6.2 valves - <br /> Valves shall be carbon steel Class 150 It. or as shown on <br /> t; <br /> the drawings, , <br /> 5.7 Painting - <br /> 5.7 .1 Surfaces to be Painted <br /> General All exposed metal aboveground is to be cleaned, <br /> primed and painted in accordance with thisspecification. <br /> , This includes pipe, valves, -fittings, tanks, ladders, <br /> manhole covers, and all other metal surfaces. The <br /> ,%,;' aboveground tanks will be furnished by Exxon to the <br /> r �r contractors with surface preparation and one coat of primer <br /> W1;0 <br /> + already applied in the shop. For these. tanks the work is ' <br /> .. limited to touch up of the shop primer and then a second <br /> 3' coat of primer and the finish colt in the field . (Std No. <br /> II-14-ATI.9) <br /> 5.7 .2 Painters to stencil ID numbers and titles on the tanks <br /> and piping per plant operations preference. <br /> 5.7.3 . Apply quality "non skid" type surface to the top of <br /> k all tanks . <br /> y y3 5.7 .4 Surface Preparation <br /> SSPC - SP 6-63 Commercial blast minimum. <br /> 5.7.5 Primer <br /> 1 <br /> i Per Exxon standards, <br /> 5.7 .6 Finish coat <br /> m'aas`, <br /> Per. Exxon standards . <br /> + 6 EOyjgMFNT SUPPLIED BY EXXON :. <br /> " 6.1 General <br /> t-% Following is a list of equipment to be furnished by Exxon. All <br /> other equipment and material required for the completion of this <br /> work shall be furnished by the contractor . <br /> 6 .2 Eauioment List _ <br /> ')K ' <br /> One (1) gallon vertical tank or one (1) gallon <br /> horizontal skid tank <br /> One (1) Tank ladder <br /> One (1) Ground level gauge (vertical tank only) <br /> )w+$ " <br /> One (1) Tank pressure/vacuum vent with gauge hatch I <br /> One (1) Tank emergency .vent ` .. <br /> One (1) Tank. manhole cover with gasket and bolts <br /> f LIST OFENGINEERING SPECIFICATIONS AND DRAWINGS <br /> OTHER SPECIFICATIONS <br /> Exxon Standard Paint specification Std II-14-AT1 .9 dated 1/26/82 ' <br /> Exxon Standard Underground Tanks Abandonment and Removal No . ;,. <br /> I-4-A3:0 revised 2/11/80.Standard Plant Safety Work Roles , " . <br /> i <br /> DATE REVISIONS By CHK E ON COMPANY, U.S.A. ADrvro" "Xx Co Pv TIM PROJECT NO. <br /> MarketmgDepartment Distribution <br /> FILE NO. <br /> DATE <br /> s + j r Gini/ TANKAGE MODIFICATION PROJECT RAS NO. <br /> DRAWN BY <br /> CHK BY JOB SPECIFICATION DWG. NO. <br /> SCALE SH EF T <br />
The URL can be used to link to this page
Your browser does not support the video tag.