My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:24:48 PM
Creation date
11/5/2018 9:17:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\N\NAVY\3505\PR0231848\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/8/2017 10:40:30 PM
QuestysRecordID
3721530
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION f 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> PLAN TYPE MONITORING 1S IDENTICAL FOR ALL LISTS AT THIS FACILITY. M <br /> 01 <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Moz <br /> I. FACILITY INFORMATION <br /> FAC1L1'fY ID#(Agencv use 01711)) <br /> FACILITY NAME — <br /> FACILITY SITE ADDRF..S <br /> L MCN' CITY <br /> Mni <br /> II. EQUIPMENT ESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g..sensors,probes,line leak detectors,etc.)be <br /> performed in ^alx' <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT 1S SERVICED <br /> �'I.ANNUALLY ❑ 99.OTHERS eci Mui <br /> ( P fY) <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location ofeach sensor, <br /> line leak detector,monitoring system control panel,etc.). Il you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Ha7mrdous Materials Business Plan map,etc.)which shows al required information,include it with this elan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING Mt I HOD(S):(Check all that apply) <br /> I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE-(S)OR SECONDARY CONTAINMENT VAULT(S) Mui. <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID ❑ c.UNDER PRESSURE d.UNDER VACUUM MTI. <br /> PANEL MANUFACTURER: _ Z'/� r�/7 UID FILLED EJ <br /> iz. / <br /> LEAK SENSOR MANUFACTURER: M14. MODEL#: ]�f MIs <br /> ❑ 2.AUTOMATIC'fANK GAUGING(AlG)SYS—EM USED TO MONITOR SINGLE WALL TANK(S) MODEL#(S): �//l_/'�S <br /> MIs. <br /> PANEL MANUFACTURER: <br /> IN-TANK PROBE MANUFACTURER: M"''. MODEL#:MIs. MODEL#(S): fes' � S M17LEAK TEST FREQUENCY: ❑ a.CONTINUOUS Min' <br /> ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY ^a20I <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): ^121 <br /> PROGRAMMED TESTS: ❑ a.O.I h. <br /> El b.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR 02646 It ❑ b•STATC.OTHER(Specify): Mzz. M23 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 ❑ STATISTICAL PER 23 CCR§2646.] nazi. <br /> TESTING PERIOD: ❑ a.36 HOURS <br /> El 5.INTEGRITY TESTING PER 23 CCR§2643.1 El b.60 HOURS M'S, <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY <br /> 6.VISUAL MONITORING DONE: �a.DAILY El c OTHER(Specify): M26. Mn. <br /> ❑ b.WEEKLY(Requires agent app o�-al) <br /> El 99.OTHER(specify): _ <br /> WK. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING ME I HOD(5)(Check all that apply) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT Man <br /> SECONDARY CONTAINMENT IS: Ela.DRY ❑iAb.LIQUID FILLED <br /> PANEL MANUFACTURER: _ ❑ C.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> M3' MODEL#: <br /> LEAK SENSOR MANUFACTURER: Msa. <br /> Msa. MODEL#(S): <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TUR ❑ b.NO BINE)SHUTDOWN? M <br /> E/ 15.I', <br /> WILL FAILURDISCONNECTION OF THE El <br /> MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES M17 <br /> El 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 ❑ b. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED g.P•h. LEAK TESTS AND RESTRICTS OR SHUTS <br /> MSF <br /> TS OFF <br /> MLLD MANUFACTURER(s): <br /> M'" MODEL#(S): <br /> El3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 My <br /> ELLD MANUFACTURER: g.P h.LEAK TESTS <br /> "'a". MODEL#: <br /> PROGRAMMED LINE INTEGRITY TESTS: ^aal. <br /> ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1h. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? g P Ma'. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES El h.NO ^A43 <br /> ❑ 4.INTEGRITY TESTING ❑ a.YES ❑ b.NO M44, <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS <br /> ElS.VISUAL MONITORING DONE: ❑ a•DAILY c.OTHER(Specify) Mas. Mar.. <br /> ❑ b.WEEKLY' ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED <br /> "Requires agengy approval •"Allowed for monitorinrgme, {i Mal. <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3)3i 'pg only per HSC h25281.5(bNl) <br /> 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> [1 <br /> ❑ 99.OTHER(Specify) <br /> SJCEHO-d(07/03)-1/4 Man <br /> 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.