Laserfiche WebLink
MVCNIFEED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 490.546 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 4.NODISPENSERS ❑99.07UER(Specify): _ <br /> PANEL MANUFACTURER 490'55_ MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490-57 MODEL#(S): 490.513 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 49040 <br /> FAILURE/DISCONNECTION OF UDC MONI'T'ORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a YES ❑b.NO 49NU <br /> 2.UDC CONSTRUCTION IS ❑L SINGLE-WALLED ❑2.DOUBLE-WALLED 49M3 <br /> IF DOUBLE WALLED: 49054. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: L LI UID 02.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTA]NIMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 490.646 <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR$2644.1 <br /> V2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49°-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 4wo 8a ❑Visual Inspection Records 49049b ❑Tank integrity testing results 490.68c <br /> ❑SIR testing results(and supporting documentation records). 49a68d ❑ Tank gauging results(and supporting documentation records). 49a6se <br /> ❑ATG Testing results(and supporting documentation records).490.68e ❑ Corrosion Protection 60-day logs 49M89 <br /> IXEquipment maintenance and calibration records. 4M613h <br /> IX.TRAINING <br /> %Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490.69. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> J:THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49M9b <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49049c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION'490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h;mwi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here <br /> eo�orrp indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-n <br /> A0010 OSL�� A <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:I)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The followinperson(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME M1&u1-? - 490.71 TITTLE E�-d"�I."—lam 7 –1f1�81'� 490-73 <br /> NAME 490.74 TITLE 490.75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and infoan the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490.77 <br /> 4� 9 <br /> RE aNT1NG 1 T k weer/O er.t 2 Facili Ovnxr/0 eremr 3.A. dR enwtigdOwner <br /> APPLICANT NAME(print): f, 490.78 APPLICANT TITLE: 490.79 <br /> UPCF UST-D(12/2007)3/4 <br />