Laserfiche WebLink
3 <br /> I <br /> '"Ru OF IRuSIEES <br /> "'ae Culbertson Pre$ SAN JOAQUIN LOCAL HEALTH OISTHICT <br /> P.ulcla E. Vannuccl, Sec' SERVING <br /> Anlhonelte Ven SprOnsen y <br /> 1601 East Hazelton Avenue, P. City of Lodi <br /> E.rl Plm ental �� 801( 2009 Sen City <br /> County <br /> Fern eugt," Stockton. Callfornla 95201 City of Escelon <br /> Daniel L. Flores 209/«•6781 City of Manteca <br /> John 0. Meet, M.D. City of Ripon <br /> William J. Wed. City of Stockton <br /> Mary Anne Love JoQI Khanna, M.O., M.P.H., District Health officer Clty of Tracy <br /> San Joeduln County <br /> San Joaquln County <br /> Facility Name <br /> Address �'2 S^ 1V'4 f74GlC-7U� <br /> Date of Inspection � �' <br /> inspector <br /> MONITORING ALTERNATIVE .Y1 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> Thismonitoring alternative shall include: <br /> —_�LAn al precision test on tank and i in <br /> P P 9• <br /> Tank gauging performed as follows: <br /> JLTank (rust be capable of being secured to prevent unauthorized inputs and <br /> w thdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 ho <br /> (2 days) at the end of consecutive nup to 7 ay period <br /> s. <br /> (For example: tank in use Mondaydthrough Friday, then locked <br /> oveLiquid level measurements rare etaken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For` example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> / If liquid level varies more than 1 % of the tank volume or 5all n <br /> ever is less , between measurements , an unauthorized release shall <br /> be which <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours , as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> complImplementation of the monitoring alternative requires that the following circled items be <br /> eted by the dates specified. �j <br /> V Precision test(s) must be performed by �p <br /> �f office within 30 days of the test. and results submitted to this <br /> Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> ate. <br /> 1/86 UGT 3 <br />