Laserfiche WebLink
8. a. Descrtbe the method that will be utilized to purge andlor inert the tank(s): <br /> lonk w )1 &fw�� ysio <br /> b. 'TanWPlping Hauler: 1 <br /> Name f <br /> Address city Zip <br /> Phone <br /> Hauler Registration#(if hauled as hazardous) <br /> C. Tank[Piping Disposal Site: N r <br /> Name <br /> Address City Zip <br /> Phone No.( <br /> EPAM#(]f transported to a permitted TSD facility) <br /> 9. Is the sampling flrm an independent third party from the contractor? YES[' NO[J 0A � <br /> s <br /> J 9a. Describe,in detail,how the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> 10, Describe how the excavation will be backfilled with suitable material upon removal: <br /> A)) <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpl]e? <br /> c)Contaminated Soll Hazardous Waste Hauler. <br /> Name A)l Pr Hauler Registration#' <br /> Address city Zip <br /> Phone No. <br /> jI Eli 23 096(Revised 08113199) Page 5 <br /> i <br />