Laserfiche WebLink
Name of Supplier,Owner or Dealer Address No.and Street(s) City State Dale of Test <br /> D 15. TANK TO TEST 16. CAPACITY From <br /> ,Station Chart <br /> nowp ��° ' ��/h, By most accurate IC ❑ <br /> I eat W 1� Nominal Capacity" ��JJ �'ti••/ capacity chart available-Si 0 Tank Manufacturer's Chart <br /> m ® Identity by position Gallons Gal ns Company Engineering Data <br /> keo'U L, Is there doubt as to True Capacity? Charts supplied with �PtrO TItP <br /> Brand and G:ede See Section"DETERMINING TANK CAPACITY" ❑ uzEsrra <br /> Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to Ve in. Gallons ea.Reading <br /> Stick Water Bottom / <br /> before Fill-up _ Inventory <br /> to s/a in. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter S t r Product in full tank(up to fill piped <br /> O <br />� � 0 <br />-4 o o 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK �' `- VAPOR RECOVERY SYSTEM <br /> ZD See mama[sections applicable.Check below and record procedure in log(261. _���, pp//«��9�, El Stage <br /> " N 0 ❑ Water in tank High water table in tank excavation � Line(s be ni g"�ested With LVLLT ��°` a-stage 11 <br /> oyao < <br /> 0 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK, <br /> 19. TANK MEASUREMENTS FOR <br /> 4 Is Today Warmer?(] Calder?(]_°F Product in Tank... 'F fill-up Product on Truck—*F Expected Change( +or -) <br /> ro TSTT ASSEMBLY 39 <br /> Bottom of tank to Grade 22. Thermal-Sensor reading after circulation °F <br /> Add 30"for.4"L ................. _." igits Nearest <br /> Add 24"for 3"L or air seal ....... " 23. Digits per°F in range of expected change <br /> Total tubing to assemble Approximate ...,,,,,, digits <br /> J <br /> N H I /�' 24. Vii' i�OT, x 1 ' — � gallons <br /> 20. EXTENSION OSE SETTING total quanuty in coefficient of expansion for volume change in this tank <br /> Tank top to grade*.................................. " full tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more �Ay,, <br /> below tank top ........................ 25. !r j '[ /l �.q -3 J to _ / �f / This is <br /> ,r volume change per—°F(24) Digits per°F in test Volume change per digit. test <br /> If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. VOLUME MEASUREMENTS(11) 34' TEMPERATURE COMPENSATION 38•NET VOLUME 39•ACCUMULATED <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TD.00T GAL USE FACTOR(a) <br /> CONTROL EACH READING <br /> 27. 28. 29. Standpipe Level 32. 35. 36. 37. Temperature At High Level record <br /> in Inches Product in Product Change Computation Adjustment Total End Deflection <br /> LAE Record details of setting up Reading Graduate Replaced(—) Thermal Higher+ (c) x (a)= Voiume Minus <br /> and running test.(Use full Na. Beginning Level to Sensor Lower Expansion+ Expansion(+)or At ter level compute <br /> TIME length of line if needed.) of which Before After Product Reading (c) Contraction- Contraction(-) change per Hour <br /> (24 hrJ Reading Restored Reading Reading Recovered[+) ,R33(V)-#37(T) {NFPA criteria} <br /> i <br /> � m <br /> �' � '��� '7 r 1�• J f.06UO C7c460 <br /> e <br /> S e 7 e© 0T 17( l 0 -,01q <br /> 15,T l oc its ft,004 <br /> ��J 1 ° A �y 1 `i ®yam! ,dye <br /> d $Yo11� Ata F i731 f�&4-D &'M 1�+' f 40 <br /> 41 CW, <br /> 3 r3 r 1 , q ,OSS` ?4q 5"' r o7 ,da 7 0 <br /> jr 1! �3r � r� r� a rose ,0,5_1:i ap .e ziia <br /> ,0`tS- �-by 1041 t00 1 od <br />