Laserfiche WebLink
• oao'.. <br /> 9TATE OF CALIFORNIASTATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARKONLY ❑ 1 NEW PERMIT 'rS_3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> Foi <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: Za/ O O/r/ <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.i{ 8. MANUFACTURED BY: <br /> i <br /> C. DATE INSTALLED(MO/DAY/YEAR) v, 0. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS FA-11S MARKEO,COMPLETE ITEM C. <br /> A. Tsd�l1 MOTOR VEHICLE FUEL 4 OIL B. C 1a REGULAR 3 DIESEL L-16 AVIATIONGAS <br /> ❑ UNLEADED 4 GASAHOL <br /> ❑ 2 PETROLEUM ❑ 60 EMPTY [Al PRODUCT lbPREMIUM <br /> 5 JET FUEL ❑ 7 METHANOL <br /> UNLEADED❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.III: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> i BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK <br /> MATERIAL ❑ 5 CONCRETE ❑ e POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 1009: METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION F791 NONE N5 UNKNOWN E::] 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) "----- OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A4rP SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A N„y SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A41E�M>NKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 M ER NI ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER G <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN 99 OTHER`%q^'K <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAV/V R) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH NO <br /> SUBSTANCEREMAINING GALLONS INERT MATERIAL? YES [:] ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED A SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION If �FACILITY# TANK# <br /> STATE I.D.# L L J����-�I� <br /> PERMIT NUMBER PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATE 'E.—r— S� <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK RE ULATIONS <br /> FORM B (12-91) 0 0 V FORO0 B-116 <br />