My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
251
>
2300 - Underground Storage Tank Program
>
PR0500968
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 2:26:10 PM
Creation date
11/5/2018 10:28:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0500968
PE
2381
FACILITY_ID
FA0009035
FACILITY_NAME
CELPRIL
STREET_NUMBER
251
STREET_NAME
OAK
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
219-390-02
CURRENT_STATUS
02
SITE_LOCATION
251 OAK ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\O\OAK\251\PR0500968\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
5/25/2016 8:49:05 PM
QuestysRecordID
3093839
QuestysRecordType
12
QuestysStateID
1
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grl-.lf•rl...•-on, N••.-•--- 0^14 J' 'tilt t_WTL rAQML l rt Ui,>l fAll.1„�' aE1llnHo <br />.^+• <br /> alNaaa E. v.nn.aoct, 0East ate(ton vonve� Gly of teal <br /> MAawM1a Van tfrow1601 EHAP. 0.Got( 2009 sanJodqutnCount <br /> 04rsvr. nt.t Stockton.Glllornla 95201 ply W Eaulo <br /> Cay(Manl•en <br />"A ava� 209f,(M-6781 Gly ofRlpon <br />.nl•I 1. Flog•. City of blocklon <br /> hw O. Mad(, M.D. City of T/acy <br /> IIIiam J. Wada Jool Khanna. M.O., M.P.H.. Ot•IAet H«Ilh 0114cw Sall Joaquin Counly <br /> M' A"a lova se""qutncounty <br /> facility Name Ct:' L. e&jSTn-iF, 5 4-?1G <br /> Address <br /> Date of Inspection /'2 3i l Inspector til/ <br /> MONITORING ALTERNATIVE 15 <br /> Annual precision test on tank(s) and piping. <br /> ,_,4Oatly-invent0ry reconciliation with submission. of quarterly statement 'regarding <br /> compliance with allowable variation. <br /> Pipeline leak detectors on pressurized piping. <br /> _TOaily operational check of suction piping function. <br /> Calibrated meters for inputs and withdrawals: <br /> /ifetghts and Measures sticker <br /> [/ Certification by qualified repairman <br /> Implementation of this.manitoring alternative requires that the following CIRCLED items <br /> be completed by the specified dates. <br /> Precision test(s) roust be performed by ( b' ( and results submitted to <br /> this office within 30 days of the test. <br /> 2. Pipeline leak detectors must be installed on pressurized piping by <br /> GDaily inventory reconciliation must be started immediately, with records maintained <br /> at the facility for review. <br /> Document daily check of suction piping (unction starting immediately. <br /> 0 Submit quarterly Statement to this office that allowable variation on inventory <br /> reconciliation has not been exceeded or a list of dates and variations that <br /> exceeded allowable the first statement is due by <br /> Dispenser meler(s ) mutt be calibrated by p with copy of <br /> . PY <br /> certification or Weights and Measures thicker number sutwmittcd to this office. <br /> If the above compliance dates cannot be mel , contact this office prior to the specified <br /> dale. <br /> If allowable daily inventory variation is exceeded, refer to Section 7644( ( ) for <br /> required actions. <br /> A rialttra.> . , <br />
The URL can be used to link to this page
Your browser does not support the video tag.