MATERIAL AND WORKMANSHIP 11. SAFETY PLAN. CONTRACTOR SHALL DEVELOP AND MAINTAIN, FOR THE B: VENT/VAPOR PIPING: RED THREAD IIA ,ANP RED THREAD II WITH UNDERGROUND TANK CLOSURE PLAN
<br /> DURATION OF THE CONTRACT, A 817E HEALTH 4 SAFETY PLAN THAT WILL FITTINGS AND 1000 AND 8000 SERIES ADHESIVE, OR AMERCN DUALOY
<br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, 3000L WITH ALCOHOL FITTINGS AND W48 ADHESIVE. DO NOT MIX 1.0 GENERAL INFORMATION o
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK AND: MANUPACTURER'B MATERIALS.
<br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE 1.1 LOCATION OF TANKS: QUIK STOP 16 (q co
<br /> GRADE FOR THE PROCESS INTENDED. A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO 18 QUALIFIED C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN 1030 S. OLIVE AVE. M
<br /> AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE TRAINED BY MANUFACTURER MODESTO, CA 95205 `'� W N X
<br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR HIS HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATION$ OF NOW 948-6131 �^ N
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND THE SAFETY OFFICER TO THE OWNER'6 AGENT PRIOR TO COMMENCING WORK D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE ON THE SITE. 40, OR EXTRA STRONG. GALVANIZED PIPE IS NOT ALLOWED. FITTINGS 1.2 OWNER: QUIK STOP MARKETS, INC.
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY ANP - 8HALL BE 300 PSI MALLEABLE IRON. P.O. BOX 5145 Oa. Q O d'
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE FREMONT, CA 94531
<br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES E: ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20 (510) 651-8500 M W N 0 d'
<br /> NEAREST THE SITE, AND A MAP TO THE! HOSPITAL. PROCEDURES SHALL BE MILP
<br /> . VG PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL �Sto
<br /> 3. WHEN
<br /> NR E UIRED, TBHE CONTRACTOR SHA Y THESE DOCUMENTSORFURN 9H WHEN THE D FORENT BY THE OR TTEN HAZARDOUS IN THE LANSUBFOR ACTIONS
<br /> ES 15E UN OTO BE RED.TAKEN SHOULD STRANGE ODORS TAPE$, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. 1.3 PROJECTED CLOSURE DATE: TO BE DETERMINED Z F co To
<br /> OWNEAPPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLE8 F: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT 1.4 TANK DATA:
<br /> WHICH HE CONTEMPLATE$ INCORPORATING IN THE WORK WHEN SO C: IF, DURING THE COURSE OF THE WORK UNSAFE CONDITIONS DEVELOP WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL W o N U)
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH NUMBER GALLONS MATERIAL PRODUCT !
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. CONDITION. IF THE CORRECTIVE ACTION 18 INSUFFICIENT IN THE PETROLEUM SOLVENT$, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH h i
<br /> OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. 16-1 10000 STEEL UNLEADED GASOLINE d W W Q C
<br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED CORRECTIVE ACTION CAN BE IMPLEMENTED. 16-2 10000 STEEL UNLEADED GASOLINE 11) m T. *,.
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT G: U.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALLW
<br /> REJECTION. D= PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. It
<br /> CLASS RATING OF 2-A,20-B:C WITHIN 50 FEET OF THE OPERATION. 1.5 HISTORY: INSTALLED 1913
<br /> If) tO
<br /> 5. ALL UJORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND Z0. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER �
<br /> REGULATIONS. 18. UNDERGROUND SERVICE ALERT (USA.) - THE CONTRACTOR SHALL NOTIFY TANKS SHALL BE MINIMIZED- MAINTAIN MINIMUM CLEARANCE A$ SHOWN ON 1.6 CONTRACTORS: � Sr2l
<br /> MEMBERS OF U.S.A, 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING DRAWINGS. MINIMIZE GROSSING OTHER LINES AND CONDUIT. IF PIPING
<br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM 18 NOT SHOWN ON SITE PLAN, G.C. SHALL RUN LINES THE MOST DIRECT GENERAL: TO BE DETERMINED
<br /> ANDTTHESE HE OWNER'S DOCUMENTS.
<br /> CONFLICTS SHALL BE BROUGHT TO THE ATTENTION NUMBER (800) 221-2600. ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE.OF Q
<br /> PRODUCT REMOVAL: QUIK STOP MARKETS, INC.
<br /> 21. EXISTING VENT RISERS ARE SHOWN ON SITE PLAN. INSTALL NEW SWING
<br /> 1. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS PETROLEUM WORK SCOPE JOINTS AT BOTTOM OF VENT RISERS. BOTTOMS REMOVAL: TO BE DETERMINED
<br /> PROJECT, IT IS EXPECTED THAT THE M08T RESTRICTIVE CONDITION(5) 22. PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S TANK HAULER: TO BE DETERMINED
<br /> WOULD APPLY. I. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE ��
<br /> SCHEDULE THAT ALLOWS THE SITE'S STORE TO REMAIN OPEN TO THE PRECEDENCE OVER OTHER INSTRUCTIONS. GEOLOGIST COMPLIANCE ENCLOSURE
<br /> FULLEST EXTENT P0881BLE.
<br /> GENERAL CONDITIONS A: G.C, TO NOTIFY OWNER'$ REPRESENTATIVE TWO WORKING DAYS PRIOR TANK DISPOSAL FACILITY: TO BE DETERMINED QUIK S T O P
<br /> 2. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP TO LINE TESTING. OWNER'S REPRESENTATIVE SHALL WITNESS ALL LINE
<br /> 1. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOUR$ OSHA TRAINING OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY TESTING. MARK TEST PRESSURE& ON GAUGE WITH ELECTRICAL TAPE AT 2.0 CLOSURE PROCEDURE-REMOVAL OF TANKS
<br /> COURSE PRIOR TO THE START OF WORK CERTIFICATION OF THIS MUST BE SECURE FENCING PANELS TOGETHER BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (U
<br /> PROVIDED TO THE OWNER'S ENGINEER PRIOR TO THE START OF WORK HOUR AND BE WITNESSED BY OWNER5 REPRESENTATIVE. DO NOT BACKFILL SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION TANK 76
<br /> 3. FLUSH, CUT, AND REMOVE PRODUCT LINES FROM EXISTING TANKS TO TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. GU SUREES 8 ALL BE FOD LOWED, D EXCEPT WHERE GROUNDWATER SAMPLIN1030 S. OLIVE AVE.
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'6 DISPENSER ISLANDS.
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH 1994 CALIFORNIA UST B: TEST PRESSURES SHALL BE: SPECIFICATION$ ARE MORE RESTRICTIVE.
<br /> REGULATIONS. CERTIFICATES 8HALL BE PROVIDED TO OWNER 4. REMOVE ALL EXISTING FUEL DISPENSERS, ISLAND$, BARRICADES, FUEL 2" - 50 PSI AND APPLY SOAP SOLUTION. rJ' TOCKTON, CA 95205
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST LINES, CANOPY, ASPHALT AND CONCRETE SURFACES A$ REQUIRED, IN 3" - 40 P61 AND APPLY SOAP SOLUTION. REMOVE ALL PRODUCT FROM TANKS. 20S-S48-0131SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PREPARATION FOR INSTALLATION OF NEW A8 SHOWN ON DRAWINGS. ANY 3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION,
<br /> OU.NER SALVAGEABLE EQUIPMENT TO BE REMOVED FROM SITE AS DIRECTED BY REMOVE ALL RESIDUAL LIQUID, SOLIDS, OR SLUDGES. SAN JOAQUIN CO.
<br /> OWNER REPRESENTATIVE. C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR APN Idl-214-03
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK TO TESTING. APPLY 4 RELEASE PRESSURE SLOWLY. VENT/VAPOR SYSTEM PURGE ALL VAPORS FROM TANKS WITH A MINIMUM OFfiFT66N-F-IB4 140
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 1994 5. PREPARE FOR REMOVAL AND REMOVE 2 UST's, (2) AT 10000 GALLONS SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(S), EXTRACTOR POUNDS OF SOLID CARBON DIOXIDE (DRY ICE) FOR EACH 1,000 GALLONS
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO (GASOLINE) STORAGE TANK$ IN ACCORDANCE WITH THE BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR OF TANK CAPACITY AND PRESENT SALES 6LIP$ TO INSPECTOR
<br /> OWNER CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST UNDERGROUND TANK CLOSURE PLAN. OWNER WILL EMPTY TANKS OF LINE$ TO ISLANDS AND STAGE II FLEX CONNECTORS AT DI6PEN$ER(S). PELLETIZED DRY ICE 16 RECOMMENDED. GAP ALL OPENINGS EXCEPT
<br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO REUSABLE PRODUCT. GENERAL CONTRACTOR TO PROVIDE FOR DRY ICE TO VENT PIPE AND ALLOW TWO HOUR MINIMUM AND SIX HOUR MAXIMUM FOR
<br /> OWNER PURGE TANKS, BUT NO LESS THAN r�LISS, PER 1,000 GALLONS CAPACITY. D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 OXYGEN DISPLACEMENT AFTER PUTTING CARBON DIOXIDE INTO THE
<br /> PSI. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS. TANKS. VENT PIPE OPENING TO BE CHECKED WITH A COMBUSTIBLE GAS ALTON
<br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK 6. CONTRACTOR SHALL PROVIDE FOR CLEANING A6 NECESSARY, CORRECT ANY LEAK$ AND RETEST. DETECTOR TO DETERMINE IF TANK B VAPOR FREE OR IF ADDITIONAL
<br /> REMOVAL AND TANK INSTALLATION PRIOR TO THE START OF WORK TRANSPORTATION, DISPOSAL OF TANKS, AND RIN5ATE IN ACCORDANCE PER DRY ICE AND/OR TIME MAY BE REQUIRED. NGINEERING, INC.
<br /> CONTRACTOR WILL CONDUCT WEEKLY JOB SITE 54PETY MEETINGS WITH IV8 COUNTY REGULATIONS, BY APPROVED HAULER CUTTING TANKS ON S1TE 18 E. SLOWLY RELIEVE PRESSURE FROM VAPOR/VENT SYSTEM AND REMOVE
<br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER NOT BE ALLOWED. PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE PLUG OR CAP ALL TANK OPENINGS LEAVING AN 1/8" - 1/4" PRESSURE
<br /> PRE56URE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVING IS RELIEF HOLE IN ONE CAP AT THE TOP OF THE TANK
<br /> S. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: 1. OWNER WILL CONTRACT WITH AND FURNISH CONSULTANT$ TO PERFORM SOIL COMPLETE. P.O. BOX 1025
<br /> AND/OR WATER TESTING UPON TANK 4 PIPING REMOVAL IN ACCORDANCE VISUALLY INSPECT THE TANKS UPON REMOVAL. ALL EXTERNAL TANK 843 RISKS LANE
<br /> A. GENERAL ENGINEERING "A" WITH TANK CLOSURE PLLW AND LOCAL REGULATIONS. (ALLOW TWENTY-FOUR F. SECONDARY PIPE MUST BE PROPERLY GUT. INSPECT ALL PRIMARY SUI�ACES AND FITTINGS SHALL BE INSPECTED FOR EVIDENCE OF HOLES WEST SACRAMENTO, NE
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING ("HAZ'V HOURS FOR RESULTS OF SOIL SAMPLES.) PIPE SURFACES. PRESSURIZE SECONDARY PIPE TO 5 P81 AND SOAP ALL OR LEAKAGE. THE RESULTS OF SUCH INSPECTION SHALL BE 95691
<br /> PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE. (91(o) 312-1888
<br /> 6, CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL' 8. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4 SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAVING IS IN PLACE OVER PATCH ANY HOLES WITH ?APPROVED MATERIAL BEFORE TRANSPORTING - -- - - FAX 3.13-1112
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OUINER BY NAMING OWNER MIL. PLASTIC UNTIL 601L IS REMOVED. SOIL TO BE STOCKPILED ON TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OU)NER'8 TANKS TO DISPOSAL 61TE.
<br /> AS "ADDITIONAL INSURED". BITE FOR SAMPLING PRIOR TO OFF-HAUL BY OTHERS AS DIRECTED BY REPRESENTATIVE.
<br /> OWNER TWO SOIL SAMPLES SHALL BE ANALYZED FROM BENEATH THE TANK ONE THESE DRAV,WS6 AVD SPECIFICATIONS,As
<br /> A STATUTORY WORKMAN'6 COMPREHENSIVE LIABILITY G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE FROM DIRECTLY BENEATH THE FILL PIPE. THE OTHER FROM A SIMILARIN57RIINTO OF SEWCE,RE$WN THE
<br /> PROPERTY OF WALTON EW NEERNS, INC.
<br /> 9. OWNER SHALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF ALL PRE65URE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER POSITION AT THE OPP081TE END OF THE TANK IF OBVIOUSLY STAINED AND $HALL NOT EE USED FOR ANY 1-UW05E
<br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE EXCAVATED SOIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION, PAVING 16 IN PLACE OR CONTAMINATED AREAS EXIST IN LOCATIONS OTHER THAN THE ABOVE OTHER THAN THOSE FOR uLL�Mi�1ICH THEY HAVE
<br /> LOCATIONS, THEN ADDITIONAL SOIL SAMPLES SHALL BE ANALYZED FROM BEEN$uPPLIED oR PREPARE1% THESE DRAwlrre
<br /> LIMIT OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INCLUDING AERATION. SHALL tUP I REpRODucED,COPIED OR TRACED
<br /> INJURY AND PROPERTY DAMAGE. 23. G.G. SHALL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING THESE OBVIOUSLY STAINED OR CONTAMINATED AREAS. SHALL
<br /> THEEXFRES$ED,CO CONSENT TRA
<br /> 10. IF REQUIRED, BACKFILL THE ABANDONED TANK HOLE ONCE ALL SAMPLING 15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION LOTHOUWALTCNENGINEERINCa, ICOOF
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED AND/OR OVER-EXCAVATION IS COMPLETED, USING SUITABLE MATERIAL. FILL LINE TEST SHALL BE IN ACCORDANCE WITH NFPA 329, LOCAL SOIL SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY SHALL BE COMPACTED A MINIMUM OF 909S MODIFIED PROCTOR VALUE TO W/IN REQUIREMENTS, OR APPROVED EQUAL. TEST SHALL BE CONDUCTED BY A JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. COPYRIGHT © 1998
<br /> OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND 3 FT. OF FIN. GRADE AND 95% MIN, FOR REMAINDER G.G. SHALL PROVIDE CERTIFIED TESTER G.C. SHALL PROVIDE WRITTEN REPORT OF PRECISION SAMPLES SHALL BE TAKEN USING A DRIVEN-TUBE TYPE SAMPLER,
<br /> PROPERTY DAMAGE. SOILS ENGINEER WHO WILL SUPERVISE THE PROCESS AND CERTIFY THAT THE TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN-
<br /> HOLE WAS COMPACTED PROPERLY. MINIMUM TESTS SHALL BE AT 5', 3', AND PROJECT. OF-CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND
<br /> 1. GENERAL CONTRACTOR TO FURNISH ALL LABOR MATERIAL, EQUIPMENT, AND I' BELOW FIN. GRADE, FOR A MINIMUM TOTAL OF THREE COMPACTION TESTS. SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. RAIN BY MEL / TG
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE PROVIDE RESULTS TO OUINER'6 REPRESENTATIVE WAN 6 DAY$. 24. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRE65URE - -
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. TO EXPEDITE THE PROCESS OF TANK REMOVAL, THE FOLLOWING CHID' BY MEL
<br /> REQUIRED BY THE DRAWINGS. 11, CONTRACTOR TO INSTALL NEW CANOPY FOOTINGS PER PLANS, ALTERNATIVE SAMPLING METHOD MAY BE USED: ---
<br /> SPECIFICATIONS, AND SHOP DRAWINGS AND ARRANGE FOR ALL 25. CONTRACTOR SHALL DO ANY OTHER TESTING A8 REQUIRED BY LOCAL DATE 15 JUN 98
<br /> 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM INSPECTIONS. PROVIDE CONDUITS FOR LIGHTING AND INTERCOM, AND REGULATIONS. AIMMEDIATELY UPON REMOVAL OP THE TANKA BACKHOE BUCKET OF
<br /> BLDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, COORDINATE RAIN LEADERS A6 NECESSARY. A. ,NATIVE SOIL SHALL BE TAKEN FROM THE NATIVE SOIL TWO (2) FEET
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGUULATIONS,TIONS, OSHA - 26. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. BELOW THE SOIL/BACKFILL INTERFACE. THIS SOIL SHALL BE RAPIDLY SCALE PLOT FULL
<br /> CONSTRUCTION SAFETY ORDERS, ANP ANY OTHER APPLICABLE STATE, CITY, 12. CONTRACTOR SHALL PLACE $OIL FROM FOOTING EXCAVATION ON, AND SHALL BROUGHT TO THE SURFACE. ---- -------------
<br /> OR COUNTY ORDINANCES. COVER WITH, 4 MIL. PLASTIC UNTIL SOIL IS REMOVED. SOIL TO BE 21. BRAVO BOXES, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE IIII,.J05 NO, 436910
<br /> STOCKPILED AND SEGREGATED ON SITE FOR SAMPLING PRIOR TO OFF-HAUL COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY OWNER'S B. APPROXIMATELY THREE INCHES SHALL BE RAPIDLY SCRAPED AWAY
<br /> 9. PETROL PERMITS TO BE SECURED BY OWNER AND SUPPLIED TO CONTRACTOR BY OTHERS AS DIRECTED BY OWNER REPRESENTATIVE AS FOLLOWS: FROM THE SURFACE OF THIS SOIL, THEN A CLEAN BRASS TUBE (AT
<br /> CONTRACTOR 18 RESPONSIBLE FOR COMPLYING WITH ALL PERMIT
<br /> LEAST THREE INCHES LONG) SHALL BE DRIVEN INTO THE 901E WITH A
<br /> CONDITIONS. 13. CONTRACTOR TO SCHEDULE AND ARRANGE CANOPY WORK PER DRAWING$ AND 1. FILL WITH WATER TO HIGHEST PENETRATION. SUITABLE INSTRUMENT (WOODEN MALLET, ETC.). REVISION$
<br /> SPECIFICATIONS. CONTRACTOR SHOULD BE PRESENT TO COORDINATE 2. SPRAY PAINT TOP OF WATER -- -----
<br /> 10. GENERAL CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF ELECTRICAL, INTERCOM, DRAINAGE REQUIREMENTS. C. THE ENDS OF BRASS TUBE SHALL BE COVERED WITH ALUMINUM FOIL, DATE REV DESCRIPTION 15
<br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. 28. PROVIDE AND INSTALL CONDUIT 4 WIRING FOR PETROLEUM SY&TEM($) AND THEN PLASTIC END CAPS, AND FINALLY WRAPPED WITH A SUITABLE -- -
<br /> 14, EXCAVATE AS NECESSARY FOR THE INSTALLATION OF REPLACEMENT TANKS. CANOPY LIGHTING. PROVIDE CONDUIT FOR FUTURE CARDREADER$ AND TAPE.
<br /> 11. GENERAL CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO OTHER SITE ELECTRICAL AS INDICATED ON THE DRAWINGS. _
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR 15. CONTRACTOR SHALL COVER EXCAVATED SOIL WITH 4 MIL. PLASTIC UNTIL D. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON TGE, OR DRY ICE,
<br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY SOIL IS REMOVED. SOIL TO BE STOCKPILED AND SEGREGATED ON SITE 29. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT. FOR TRANSPORT TO A LABORATORY. AGAIN, FORMAL CHAIN-CF-CUSTODY _
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S FOR SAMPLING PRIOR TO OFF-HAUL AS DIRECTED BY OU,NER RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE.
<br /> OPERATIONS. 30. INSTALL MONITORING SYSTEM WITH HYDROSTATIC PROBES, TURBINE SUMP IF THE BOTTOM OF THE TANK I$ BELOW THE GROUNDWATER TABLE, THEN
<br /> 16. INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES PER PROBES, AND TANK GAUGE, AND MONITOR CONTROL PANEL IN BUILDING PER SOIL SAMPLES ARE NOT REQUIRED. IN THIS CASE, A WATER SAMPLE --
<br /> 12. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND DRAWINGS, WHERE REQUIRED BY WET-HOLE CONDITIONS. PROVIDE TANK DRAWINGS. SHALL BE COLLECTED AS SOON AS POSSIBLE FROM THE SURFACE OF
<br /> STATE REGULATIONS. THE CONTRACTOR 15 REFERRED TO THE OSHA HOLD-DOWNS AS REQUIRED BY MANUFACTURER IN WET-HOLE CONDITIONS. THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE --- -
<br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK 31. INSTALL NEW GILBARCO MPDS, SINGLE-HOSE DISPENSERS, AND CONSOLE MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 15
<br /> PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK 11. INSTALL 2 - 12.000 GALLON TANKS PER DRAWINGS AND CURRENT AS INDICATED ON SITE PLAN AND DESCRIBED IN THE EQUIPMENT LIST. DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE _
<br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON AS EACH STEP 18 COMPLETED. TANK BEDDING AND BACKFILL TO BE PEA WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE
<br /> MANUFACTURER'S INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL DESIGNED TO REDUCE THE LOSS OF VOLATILE COMPONENTS. A BAILER
<br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER INSTRUCTIONS. 32. INSTALL SITE LIGHTING, IF APPLICABLE, AND/OR ANY OTHER ITEM6 AS SHOWN IS A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE _
<br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS" MANUFACTURER'$ CHECKLISTS SHALL BE COMPLETED BY THE CONTRACTOR, ON THE DRAWINGS. IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL -- --
<br /> $
<br /> APPROVED JOB COPY. GRAVEL. TANK BURY 16 TO BE MINIMUM 4 FEET, TANK BEDDING I$ TO BE 33, INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE A8 USED TO SEAL THIS VIAL.
<br /> A MINIMUM I2", SPACING BETWEEN TANKS IS TO BE A MINIMUM OF IB INDICATED ON SITE PLAN CONCRETE SHALL HAVE A MINIMUM
<br /> 14 CONTRACTOR
<br /> USED SH LL PROVIDE A LIST OF 51.15-CONTRACTORB, IF ANY, WHO TANK INTEGRITY TESTING SHALL CONFORM TO MNPRB, REQUIREMENTS. COMPRESSIVE
<br /> EN STRENGTH
<br /> A 28 DAYS OF 2500 FBI.
<br /> CUBIC YALI- USE DAVIS 8084. SOL
<br /> YDRO WATEReON6 SAMPLES
<br /> HE SHALLB E ANALYZED
<br /> N 'GUIDELINES FOR SHEET TITLE
<br /> I8. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST INCLUDING ADDRE581NG FUEL LEAKS. CALIFORNIA REGIONAL WATER QUALITY
<br /> 15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND SALVAGEABLE EQUIPMENT TO BE REINSTALLED, IF ANY, AND PROVIDE AND 34. REPAIR AND/OR REPLACE A.G. PAVING AND BASE TO MATCH ORIGINAL IN CONTROL BOARD, SAN FRANCISCO MAY REGION - SEPTEMBER 1985." GEN , NOTES ,
<br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFIGATE5 INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE AREAS DISTURBED BY WORK
<br /> REQUIRED TO RUN THE FACILITY. PETROLEUM SYSTEM. LOAD TANKS ON HIGHWAY CARRIER WITH PRESSURE RELIEF HOLE UP ON SCOPE ,
<br /> 35. ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE THE ABOVE SCOPE OF WORK SAME DAY AS REMOVAL. UNLESS THE TANK$ HAVE BEEN TRIPLE RINSED,
<br /> 16. GOVERNING CODES AND STANDARDS INCLUDE, BUT 19. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR AND SECONDARY
<br /> T SHALL NOT BE LIMITED SHALL BE DONE ON A TIME AND MATERIALS BASIS. RENTAL RECEIPTS, THE CARRIER MUST BE A LICENSED WASTE HAULER AND MANIFESTS
<br /> TO, THE STANDARDS OF THE FOLLOWING:
<br /> CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'$ SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS, AND DAILY LABOR TIME MUST ACCOMPANY THE TANKS. /'� � /"9 t+ , e ® E
<br /> INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND $HALL HAVE SHEETS SHALL BE REQUIRED TO SUPPORT GENERAL CONTRACTOR TIME AND C O `7 V �l
<br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLIST$ MATERIAL INVOICES. SUCH WORK SHALL BE BILLED SEPARATELY. 3.0 REMOVAL OF PIPING
<br /> AMERICAN PETROLEUM INSTITUTE (API) SHALL BE COMPLETED BY THE CONTRACTOR AS, EACH STEP 18 COMPLETED.
<br /> AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
<br /> PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO
<br /> UNIFORM BUILDING CODE A: PRODUCT PIPING: 2" PRIMARY PIPING WITH 3" CONTAINMENT REMOVAL. PIPING SHALL BE STOCKPILED ON-SITE PRIOR TO DISPOSAL.
<br /> NATIONAL ELECTRIC CODEE (NEC)ESYSTEM 48 APPROVED BY OWNER ALL PIPING AND CONTAINMENT SYSTEMS
<br /> NATIONAL FIRE PROTECTION AGENCY I TILL) SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL VISUALLY INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A &OIL
<br /> UNDERW'RITER'S LABORATORIES, TNG. CCBE BY THE SAME MANUFACTURER WITH THE SAME SERIES ADHESIVES SAMPLE SHALL BE TAKEN AND ANALYZED FOR EACH TWENTY LINEAL
<br /> LOCAL ORDINANCES PETw
<br /> CALIFORNIA NODE OF REGULATIONS ( R) AND/OR FITTINGS. FEET OF TRENCH IF INSPECTION OF TRENCH REVEALS EVIDENCE OF
<br /> LEAKAGE. FOLLOW PROCEDURE LISTED IN RECTION 2.1 FOR SAMPLING
<br /> AND ANALYSIS. OF 7 CJ. MEETS