My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
ORO
>
200
>
2300 - Underground Storage Tank Program
>
PR0504435
>
REMOVAL REMOVAL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:42:28 PM
Creation date
11/5/2018 10:31:25 PM
Metadata
Fields
Template:
EHD - Public
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TELIC <br /> ENGINEERING <br /> CORPORATION <br /> 287 N. Cardinal Avenue • P. O. Box 2076 • Stockton, California 95201 <br /> i, <br /> i' <br /> TANK DECONTAMINATION PROCEDURES <br /> I ' Telic Engineering Corproation will remove all residue in tank by <br /> high pressure wash and steam. The tank will be steamed at 2000 - <br /> 300° for approximately 45 minu �s and then high pressure washed. <br /> All residue will be removed f Fn tank by means of a vacuum truck <br /> and transported to a state ce "tified TSDF on a hazardous waste <br /> manifest. The above tank de nntamination will be performed by <br /> Telic Engineering Corporation nd rinstate will be transported by <br /> a licensed hazardous waste . uler. Once tank is empty of all <br /> residue, the tank will be purged by means of inserting 20 pounds <br /> of dry ice per 1,000 gallons compacity of tank. Piping will be <br /> disconnected at dispenser and decontaminted by means of pressure <br /> wash and steam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.