My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
ORO
>
200
>
2300 - Underground Storage Tank Program
>
PR0504435
>
REMOVAL REMOVAL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:42:28 PM
Creation date
11/5/2018 10:31:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1989
RECORD_ID
PR0504435
PE
2381
FACILITY_ID
FA0006200
FACILITY_NAME
VALLEY BEAN WAREHOUSE
STREET_NUMBER
200
Direction
N
STREET_NAME
ORO
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14334016
CURRENT_STATUS
02
SITE_LOCATION
200 N ORO ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\O\ORO\200\PR0504435\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
11/10/2017 8:16:48 PM
QuestysRecordID
3724285
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SAN JOAQUI N LOCAL HEALTH D S S TR I CT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following re resents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the re compliance. <br /> isvert documentedsduringmclosurrecoaneUnauthor�zedth nRelbe Release notification- 4ofeet. <br /> be filled contamination ination <br /> submitted to SJLHD within 5 days. Section 2652, CCR. out and <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE <br /> 7�E <br /> ER OF LOCATION OF SOIL SAMPLESPLESLess than 1000 gallonsank Fill or pump end of tank1000 - 10,000 gallonsank One at each end of tank10,001 gallons and upORE Ends and Middle orenerally spaced alongthe length of the tankPiping EVERY 20 LINEAL FEE <br /> WATER IS PRESENT IN TANK PIT <br /> 7CLUSTER <br /> MINIMUnE7 ATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES OF WATER SAMPLES <br /> ONS wall next to <br /> ends at soil/ <br /> k) Tdwater ONErfaceER THAN <br /> Swall next to ONE OR <br /> ends.at soil/Ffaceer <br /> OTHER SPECIAL CONDITIONS <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> ohbsstruction willon wthenballorequired <br /> sampling according toethetabovemcconditionssjcal removal of the <br /> TANK SIZE MINIMUM NUMBER <br /> SOIL SAMPLES OF LOCATION OF SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tank enerally spaced along <br /> the length of the tank <br /> EH 23 047 12/88 <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.