Laserfiche WebLink
SWRCB, January 2002 Page "t of <br /> 6. PIPING SUMP TESTLNG <br /> Test Method Developed By: ❑Sump Manufacturer ❑ Industry Standard eProfessionai Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure 0 Vacuum ; Hydrostatic <br /> Other(S eco) <br /> Test Equipment Used: A( 1 u 1r,Y- Equipment Resolution: /a <br /> Sump#-I Sump#2 Sump# 3 '�Sump# <br /> Sump Diameter: L-fZr" �t t �+ i <br /> Sump Depth: (f,d r ��3 r t <br /> ---4 <br /> Sump Material: �" �,r �i i5 � a e r <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 2,3 !j 2-1 ! r <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: G �/ <br /> Portion of Sump Testedr i,�1q��Y}�,,�L25 r' Ja�r-+rI.Z 3 et <br /> Does turbine shutdown when <br /> sump sensor detects liquid(bothC Yes ❑No ❑NA t�'4es ❑No ❑NA es F]No ❑NA 114 ©No LiA <br /> product and water)?' ,/� ,1 <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe es ❑No ❑NAYes ❑No ❑NA RYes ❑No o NA ❑Yes ©No NA <br /> shutdown?* <br /> o as fail-safe <br /> verified to be El Yes )9.No ❑NA D Yes o ❑NA ❑Yes�No ❑NA 11 Yes No NA <br /> Wait time between applying <br /> press ure/vac u 4m/water and starting <br /> test: /,I I-re -e fU /V//11 N * S <br /> /Gt Ir!4"at -es <br /> Test Start Timc: 3:/5— f! per, a /0 <br /> Initial Reading(Rr): � + e)p / <br /> Test End Time: fs' , e o <br /> Final Reading(RF): <br /> Test Duration: 36 r,•, ��5 3d ebl,lstrf e)M4,ytt.t� r~f <br /> Change in Reading(RF-R"): <br /> Pass/Fail Threshold or Criteria: ,Dp g`34;/f:t•r ,11d S_ :74 <br /> Test Result: Pass ❑ Fail ` Pass ❑ fail Pass ❑ Fall ❑ Pss ❑ ail <br /> Was sensor removed for testing? Yes ❑No 11 NA )acs 11 No ❑NA I�es ❑No LJ NA C7 ❑No A <br /> Was sensor properly replaced and Yes f_j No r:1 NA 'Yes ❑No ❑NA �'es ❑No ❑NA Yes ❑No <br /> verified functional after testing? {� <br /> Comments — (include in ormalion on repairs made prior to lestin and recommended ollow-r or oiled tests) <br /> I f the entire depth of the.sump is not tested, specify how much was tested. if the answer to a of the questions indicated �tiith .in <br /> nsterislt (") is"NO"or"NA", the entire Sump must be tested. (See SWRCB LG-160) <br />