Laserfiche WebLink
SWRCB, January 2002 Pale of <br /> 9. SPILL OVERFILL CONTAINMENT 13OXES <br /> Facility is Not Equipped With S ilLOvertill Containment Boxes <br /> SpilVUverfill Containment Boxes are Present, but were Not'rested <br /> Felt Method Developed By: ; Spiil Bucket blanuf'acturc(r, Industry Standard Professional Engineer <br /> Other c'W L'ify) <br /> Test Method Used: : PreSsura Vacuum Hydrostatic-- <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill libx#_ Spill BQx f#y_' Spill Ban # Spill Box # <br /> Bucket Diameter. ,. <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and • <br /> startin test: <br /> Test StartTime: <br /> Initial Reading(Rj): <br /> Test End Time: ' <br /> f.: <br /> Final Reading(RFS <br /> Test Durati ivy' <br /> Changy in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria. <br /> Test Result: C] Pass 0 Fail C] Pass C! Fail 0 Pass L7 Fail ❑ Pass C1 Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow up jar ailed tests) <br />