Laserfiche WebLink
In addition to the submersible pump problems encountered without an in-line check valve, <br /> the metering portion of the leak detector is hammered by hydraulic shock. This results in <br /> many leaks going undetected. Those leak detectors are just not equiped for the job you <br /> purchased them for. <br /> The 99 LD-2000 isthe answer you have been looking for. VMI leak detectors, with an inte- <br /> grated check valve and pressure_refief=va[ve;wiC[save money and reduce customer frustra- <br /> tion at the dispenser and reduce service calls. <br /> The 99 L®-2000 <br /> Has A Higher Leve[Of Performance Over A broader Range of Burial Depth, Line Length, <br /> And Piping System Types Than Any Other Leak.Detector <br /> Additional Features <br /> • Over 20% increased flow capacity <br /> • Guaranteed for 24 months from date of installation to detect 3 GPH V 0 PSI leak <br /> • One Way Poppet flowpathJ <br /> • Reverse Ratio Piston / Poppet combination <br /> • Smaller Volume - Faster Response piston size <br /> • Shortest profile Leak detector available for "tight" installations <br /> • All fuels..(:gasoline-- diesel._-.alcohol ) . . __-- <br /> • ALL pipelines_...(.flexi.ble- fiberglass.7. steel) up to 400 ml. resiliency <br /> • Exceeds EPA regulations (3 GPH C 10 PSI) <br /> • Detects leaks up to 10' above the leak detector <br /> • Installs with 2 1/16" six point socket or pipe wrench <br /> Increased Flow Capacity <br /> • The 99 LD-2000 has maximized the flow and flow path in existing, older submersible pump <br /> heads. This new design allows over 20% more flow than previous LD -2000 models, maximiz- <br /> ing pump performance for earlier pump heads. <br /> Longest Guarantee <br /> • The 99 LD-2000 shares the longest guarantee available in the industry, along with all other <br /> VMI 99 LD-2000 series leak detectors. For 24 months from date of installation, the LD-2000 is <br /> guaranteed to see a 3 GPH leak-@ 10 PSI - <br /> One One Way Poppet Flow hath ath <br /> Isola` <br /> Y Poppet ____ <br /> • The y pp tes pump tlarbulence from line leak detection at pump <br /> _ _ -startup--_The_h_arderie=d_ tan[_ess=.steeCpoppe -does not d�mersierillychane because o <br /> thermal conditions encountered during station operation (precision metering change is <br /> insignificant down to -20° F). -- - <br /> A I <br /> "Patent pending <br />