Laserfiche WebLink
12 . Outline contractor's method of compliance for the <br /> requirement of submiting all Accident Investigation Reports <br /> to Unocal's project Encrineer in a timely manner, and the <br /> requirement to summarize an action plan to prevent <br /> reoccurence. (19 . 2 . 9 . ) <br /> At completion of the project, the on-site field file which will include daily <br /> 7_reports health and safety plan daily jnh safety managp�sa� Anti A injur ez <br /> ;ay occur. will he turnwl in at r=letinn of nr rips+ <br /> 13 . Attach a copy of proposed Site Safety Plan for project. <br /> =/Pyj <br /> ..Ndt.lmc <br /> 4 <br />