My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5110
>
2300 - Underground Storage Tank Program
>
PR0503081
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2021 10:08:53 PM
Creation date
11/6/2018 9:19:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503081
PE
2381
FACILITY_ID
FA0005677
FACILITY_NAME
Sears #1288/6791
STREET_NUMBER
5110
STREET_NAME
PACIFIC
STREET_TYPE
Ave
City
Stockton
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5110 Pacific Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5110\PR0503081\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/9/2017 4:04:47 PM
QuestysRecordID
3722175
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIAS WATER RESOURCES CONTR06ISARD <br /> FORM `B': UNDER ROUND STORAGE TANK PROGRAM �= <br /> TANK TANK PERMIT APPLICATION INFORMATION ® r= <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. _- z <br /> i <br /> MARK ONLY f-] 1 NEW PERMIT F-13 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED TANK 0 <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE Q11 TANK REMOVED 09 <br /> N <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: j1 U PG. � ,�L �k_V\ FARM TANK-YES❑ NO 4h, <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY <br /> F-� <br /> A. OWNERS TANK ID# CZb 0 � 9 U'--1 B. MANUFACTURED BY. C71 <br /> C. YEAR INSTALLED I q CcD. TANK CAPACITY IN GALLONS: <br /> II. TANK CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUMB. C. UNLEADED ❑ 2 LEADED ❑ 3 DIESEL <br /> ❑3 CHEMICAL PRODUCT ❑ 4 OIL c 1RODUCT ❑ 4 GASAHOL ❑ 5 JET FUEL E:] 6 AVIATION GAS <br /> ❑ 5 HAZARDOUS ❑ 80 EMPTY ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 7 METHANOL ❑ 99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.9 C.A.S.a: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,&D <br /> A TYPE OF ❑ 1 DOUBLEWALLED ❑ 3 SINGLE WALLED WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM arSINGLEWALLED ❑4 SECONDARY CONTAINMENT ❑ 99 OTHER <br /> ❑ 1 STEEL/IRON ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 8-4-6TEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑ 5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑ 7 ALUMINUM ❑ 8 100%METHANOL COMPATIBLE FRP <br /> MATERIAL <br /> ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C. INTERIOR F-11 RUBBER LINED 1:12 ALKYD LINING F--] 3 EPDXY LINING 4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING ❑-6'FNUNED ❑ 95 UNKNOWN <br /> ❑ IS LINING MATERIAL COMPATIBLEWITH 100%METHANOL7 ❑YES ❑ NO -J�wj' OTHER <br /> D. CORROSION ❑ 1 POLYETHLENE WRAP ❑ 2 TAR OR ASPHALT ❑ 3 VINYL WRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE �UNKNOWN ❑ 99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE qU 5 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> C. MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL CLAD W/FRP A U 8 100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL ACU:)5 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 5 1 VISUAL CHECK P S 2 INVENTORY RECONCILIATION P S 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P S 5 GROUND WATER MONITORING WELLS <br /> P S 6 PRECISION TESTING P S 7 PRESSURE TESTING P S 91 NONE P S 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1. ESTIMATED DATE LAST USED(MO/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH <br /> '-'-----'�— SUBSTANCE REMAINING IN GALLONS INERT MATERIAL? E]YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY X JURISDICTION B AGENCY k FACILITY ID R TANK ID N <br /> CURRENT LOCAL AGENCY FACILITY 10 NC APPROVED BY NAIAD PHONE k WITH AREA CODE <br /> I� <br /> PERMIT NUMBER PERMIT APPROVAL DATE PERMIT EXPIRATION DATE <br /> CNECKM PERMIT AMOUNT URCHARGE AMT. FEE CODE IiECEIPTN BY: <br /> Y <br /> FORM B(6-29-88) THIS FORM MUST BE ACCOMPANIED BY A FACILITY/SITE APPLICATION, FORM 'A',UNLESS A CURRENT FORMA' HAS BEEN FILED <br /> DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.