My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5151
>
2300 - Underground Storage Tank Program
>
PR0231219
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:53:44 PM
Creation date
11/6/2018 9:19:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231219
PE
2381
FACILITY_ID
FA0002836
FACILITY_NAME
SAN JOAQUIN DELTA COLLEGE DIST
STREET_NUMBER
5151
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
02
SITE_LOCATION
5151 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5151\PR0231219\COMPLIANCE INFO 1987-2015.PDF
QuestysFileName
COMPLIANCE INFO 1987-2015
QuestysRecordDate
8/15/2017 3:06:13 PM
QuestysRecordID
3580045
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATA CHART FOR TANK .SYSTEM TIGHTNESS TEST <br /> (EZY CHEK) <br />.LENT <br /> WE OF SUPPLIER. 13 � Z'g <br /> VNER OR DEALER DATE OF TEST <br />)DRESS (NO. & STREET) <br /> S/ 5 � P�a�, �� v= WEATHER TEMPERATURE <br /> TY AND STATE <br /> 1NK INFORMATION1! IN. CONTENTS(PRODUCT)G <br /> OPACITY (NOMINAL) �� GALS. SIZE OF FILL OR TEST OPENING TANK MATERIAL <br /> a O.1 /, -Ir -,c fs. _ GALLONS <br /> OPACITY (CHART) GALS. TOP OFF TIME APPROX. AGE <br /> IMENSIONS: DIAMETER 4 6" NUMBER OF GALLONS ADDED TO START TEST PUMP SYSTEM (TYPE) <br /> • LENGTH TANK NO. r S <br /> AFTER TEST <br /> INCHES OF WATER — BEFORE TEST c' <br /> TANK LAYOUT <br /> EST CALIBRATION 1 <br /> IZE OF CAL. BAR OR MUS ADDED (ALM) [FACTOR AI <br /> INE MOVEMENT <br /> LINES <br /> 1 �•.� to �r = �-� �K <br /> r to <br /> 3 — t LINES <br /> } LINES <br /> 3 G to — LINES _ 3 = -)g LINES <br /> TOTAL (ALM[ <br />!NO OF TEST CALIBRATION <br />;IZE OF CAL. BAR OR MALS ADDED (ALM[ (FACTOR A) <br />_INE MOVEMENT f' LINES <br /> 1 _ to — <br /> `, to C LINES <br /> 3 u, to _ LINES <br /> TOTAL C� LINES - 3 = LINES <br /> (ALM) <br /> ESED API SPECIFIC GRAVITY a <br /> RODUCT TEMPERATURE , (FROM TABLE A) <br /> PI SPECIFIC GRAVITY ,,j� 60° F. c rah (FRdM TABLE B) <br /> OEFFICIENT OF EXPANSION <br /> '-r,1 ..), bl q0S x S � = r7 (FACTOR B) <br /> C.0 E. TOTAL CAPACITY(GAL_) V01_-CMANGEi-F <br /> PRODUCT LINE TESTING SYSTEM <br /> PROCUCTMONITORINGCNLL Product Serial Numberl <br /> Time Ih1 I+ary) Reading <br /> Stan EI�d X FarlorJA -Gain <br /> -Lass <br /> .003 <br /> .00 <br /> .CO <br /> .00 C DATE <br /> TECHNICIAN(S) <br />
The URL can be used to link to this page
Your browser does not support the video tag.