My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5151
>
2300 - Underground Storage Tank Program
>
PR0231219
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:53:44 PM
Creation date
11/6/2018 9:19:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231219
PE
2381
FACILITY_ID
FA0002836
FACILITY_NAME
SAN JOAQUIN DELTA COLLEGE DIST
STREET_NUMBER
5151
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
02
SITE_LOCATION
5151 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5151\PR0231219\COMPLIANCE INFO 1987-2015.PDF
QuestysFileName
COMPLIANCE INFO 1987-2015
QuestysRecordDate
8/15/2017 3:06:13 PM
QuestysRecordID
3580045
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATA CHART FOR TANK SYSTEM TIGHTNESS TES I <br /> (EZY CHEK) <br /> LIENT <br /> AME OF SUPPLIER. n DATE OF TEST <br /> W <br /> NER OR DEALER _ `� _ � '� `�� �� <br /> � j/`� TEMPERATURE <br /> DDRESS (NO. &STREET) 7FC <br /> r�fd a_ WEATHER <br /> ITY AND STATE <br /> 4NK INFORMATION IN. CONTENTS (PRODUCT) <br /> APACITY (NOMINAL) � GALS. SIZE OF FILL OR TEST OPENING TANK MATERIAL St4"£L <br /> GALS. TOP OFF TIME Iv- lam- 1 GALLONS <br /> APACITY (CHART) 3 APPROX. AGE <br /> IMENSIONS: DIAMETER � NUMBER OF GALLONS ADDED TO START TEST <br /> LENGTH TANK NO.` PUMP SYSTEM (TYPE) <br /> INCHES OF WATER - BEFORE TEST fes^ AFTER TEST <br /> TANK LAYOUT <br /> EST CALIBRATION <br />,IZE OF CAL. BAR OR ML'S ADDED (AUM) (FACTOR A) <br /> INE MOVEMENT �^ i LINES <br /> 1 E j to <br /> 2 _ to - LINES <br /> to LINES J <br /> 3 - _ = <br /> TOTAL LINES 3 (AL'.ul LINES <br />:ND OF TEST CALIBRATION <br /> 3IZE OF CAL. BAR OR ML'S ADDED (ALMI (FACTOR AT (< <br /> LINE MOVEMENT7G' _ }l� LINES <br /> cl( to , T <br /> I !' _ LINES CfC C <br /> to LINES ` <br /> 3 TOTAL �'t LINES - 3 = LINES <br /> )ALtl) <br /> MEAED API SPECIFIC GRAVITY ' <br /> PRODUCT TEMPERATURE (FROM TABLE A) <br /> API SPECIFIC GRAVITY 600 F eC c� f (FROM TABLE B) <br /> COEFFICIENT OF EXPANSION <br /> x (FACTOR B) j <br /> C.O.E. TOTAL CAPACrTY(GAL.I — VOL.CHANGE'F <br /> PRODUCT LINE TESTING SYSTEM <br /> PRODUCT MONITORING ON LL Product Serial Number <br /> Time Reading +Gain +G&n <br /> (mil tars lyo. Stan End -Loss X Favor A -Loss <br /> CO3 <br /> .00 <br /> .003 <br /> 1 <br /> .003 <br /> rT ECT NI AT+i6$) DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.