My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5151
>
2300 - Underground Storage Tank Program
>
PR0231219
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:38:02 PM
Creation date
11/6/2018 9:21:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231219
PE
2381
FACILITY_ID
FA0002836
FACILITY_NAME
SAN JOAQUIN DELTA COLLEGE DIST
STREET_NUMBER
5151
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
02
SITE_LOCATION
5151 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5151\PR0231219\REMOVAL 1994 .PDF
QuestysFileName
REMOVAL 1994
QuestysRecordDate
8/15/2017 3:12:28 PM
QuestysRecordID
3580180
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(-0 co <br /> SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> m• <br /> ! �= 1010 E WELTON AVE.STOCKTON,CA 95205 <br /> • �`� lt5a�'` DEVELOPMENT SERVICES PHONE 12051 468-3120 <br /> PLANN NG PHONE 1209)468-3120 <br /> SUILDING PHONE 12091468-3123 <br /> NETGI48OR1400D PRESERVATION PHONE(2091468-3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location � �J J011 ')>,J D, t_TA <br /> ' Owner TOS I ACr i Q A1. _ <br /> Phone Nv. - �� <br /> co Phone No. 4RSF-34S� License No. ? 3 5r5�o <br /> Contractor A A)�S -� <br /> 1 INDICATE METHOD OF BACKFILL QUALITY ASSURJLNCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> oad <br /> within <br /> s of <br /> ctn <br /> 2. Submission of verification,completion that one of the following lmate materials wras placed in hey excavationein <br /> ' 12" lifts: <br /> f A. Pea gravel - smooth, rounded material not more than one <br /> tl/2) <br /> inch in diameter. <br /> B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> ! the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> ' will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> 1 JOW 010o/z, <br /> Name (Print) <br /> Title (Print) <br /> ignature <br /> Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> ! 6/41-LC/SECERT-DOC <br /> ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.