My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5151
>
2300 - Underground Storage Tank Program
>
PR0231219
>
REMOVAL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 6:04:04 PM
Creation date
11/6/2018 9:23:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1990
RECORD_ID
PR0231219
PE
2381
FACILITY_ID
FA0002836
FACILITY_NAME
SAN JOAQUIN DELTA COLLEGE DIST
STREET_NUMBER
5151
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
02
SITE_LOCATION
5151 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5151\PR0231219\REMOVAL 1990 .PDF
QuestysFileName
REMOVAL 1990
QuestysRecordDate
8/15/2017 3:22:54 PM
QuestysRecordID
3580305
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Plan for monitoring of potential exposure hazards to <br /> workers and the community. <br /> o Personal protective equipment to be used for each job <br /> classification. <br /> 0 site map indicating work, contamination reduction, and <br /> support zones, including security measures. <br /> 0 Procedures to be used for decontamination of personnel, <br /> personal protective equipment, and excavation equipment. <br /> 0 Safe work practices. <br /> o Medical and emergency services to be used, including <br /> route to the nearest hospital. <br /> o Any standard operating procedures (e.g. , respirator fit <br /> test procedures) . <br /> o Personnel training programs required. <br /> o Company medical surveillance program. <br /> o Format for record keeping. <br /> 9. 0 POST-CLOSURE MAINTENANCE <br /> It is expected that no hazardous waste will remain once the tanks, <br /> piping, and soils are removed. If contamination is indicated from <br /> the soil or water analyses, or from visual evidence during tank <br /> removal operations, further investigations will be implemented. <br /> 10. 0 AMENDMENTS <br /> This closure plan will be amended when a change in procedure or <br /> schedule is necessary. Amendments will record the change and the <br /> date it is effective. PHS/EHD will be notified of the amendment 30 <br /> days prior to the effective date. The closure plan will be kept on <br /> file at the job site. <br /> 11. 0 NOTIFICATIONS <br /> A written notification will be given to the PHS/EHD 20 days prior <br /> to the expected date of closure. Permits and written notification <br /> are also required for submittal to the PHS/EHD, the local fire <br /> department and possibly. for the San Joaquin County Air Pollution <br /> fControl District as well. <br /> 12 . 0 CERTIFICATION <br /> Upon completion of closure, the contractor will submit a certifica- <br /> tion, validated by a registered professional engineer, that the <br /> facility has been closed in accordance with the approved closure <br /> plan and all applicable California state laws. <br />
The URL can be used to link to this page
Your browser does not support the video tag.