Laserfiche WebLink
I <br /> 8. a. Describe the method that will be utilized to purge and/or Inert the tanks <br /> y&--I <br /> b. TanklPlping Hauler. <br /> Nameg,� <br /> Address city -72Pr,v6 zip c3 f0 <br /> Phone No.( / <br /> Hauler Registration#(if haule d as hazardous) /VC) h/a <br /> C. TankMping Disposal Site: <br /> Name 1 G V/ / A��/V/ <br /> Address �T E� �h'c Lance CityAA Zip-1i— 0 <br /> Phone No.( `� <br /> EPA Dkl(If transported to a permitted TSD facility) <br /> 9. Is the sampling firm an Independent tblyd party from the contractor? YES H-' NO[] <br /> 9a. Describe,in detall,how the soil andlor water sample(s)/ben' eath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soli <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> (� lit/Z �i <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name /1/�^/��.J /J 7iNrG% Hauler Registration# <br /> Address City Zip <br /> Phone No. ) <br /> EH 23 046(Revised 08113199) Page 5 <br />