Laserfiche WebLink
L <br />E <br />Soil cuttings and possibly other waste material produced during drilling and <br />sampling of boreholes and wells will be placed in drums and sealed prior to <br />leaving the drilling location. Proper disposal of drummed soil cuttings will be the <br />responsibility of the client. <br />Upon completion of sampling, all borings will be backfilled with a mixture of neat <br />cement grout containing 3 to 5 percent bentonite powder. After the cement grout <br />mixture has settled, boreholes will be capped -off until they are flush with the <br />ground surface. Borings drilled in parking areas (through asphalt) will be <br />capped with asphalt cold patch. The thickness of the asphalt cold patch will be <br />similar to that of the original asphalt. <br />Upon completion of the field investigation and receipt of the signed written <br />analysis from the laboratory, a report detailing the findings and expressing our <br />recommendations will be prepared and submitted. <br />Zh. W" D. sema , R£. <br />