My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5525
>
2300 - Underground Storage Tank Program
>
PR0231220
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 12:08:45 AM
Creation date
11/6/2018 9:35:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231220
PE
2381
FACILITY_ID
FA0003705
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #4
STREET_NUMBER
5525
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
02
SITE_LOCATION
5525 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5525\PR0231220\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
10/27/2017 7:01:31 PM
QuestysRecordID
3706056
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • czoua <br /> STATE OF CALIFORNIA V� <br /> STATE WATER RESOURCES CONTROL BOARD 3_ <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B w��, <br /> n -Y� 3, oA <br /> .� `ids . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. """"� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> —55 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# B. MANUFACTURED BY: ✓�,/ <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: 5 <br /> II.TANK NTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> 1a REGULAR 3 DIESEL <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. UNLEADED ❑ 6 AVIATION GAS <br /> I� d GASAHOL <br /> ❑ 2 PETROLEUM ❑ 60 EMPTY 1 PRODUCT I_y UNLEADED ❑ 5 JETFUEL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE rLy6 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED hW (U, a4ler C.A.S.4: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT )VAULTED TANK) ❑ 99 OTHER <br /> B. TANK F-] 1 BARE STEEL ❑ 2 STAINLESS STEEL [—] 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> (PrlmaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNO E::] 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO <br /> ��' <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL <br /> RING ❑ 89 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIM D TU f/DAY/VR) 2.ESTIMATED QUANTITY OF 3.WAS TANKFILLEDWITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL? YES ❑ NO <br /> THIS FOR HAS ifEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE HEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 8 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# � Z 01 I I 1 1 <br /> PERMIT NUMBER PERMIT APPROVED BWDATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILE <br /> FOROW489S <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.