Laserfiche WebLink
POST OIL&CONSTRUCTION TEL :916-372-4079 May 22 95 16 : 17 N© .017 P .02 <br /> MONITORING EQUIPMXNT ON SITE <br /> Oxygen Meter/LEL YES <br /> Other <br /> PROTECTIVE EQUIPMENT <br /> Temporary Fencing YES <br /> Barricades YES <br /> Trench Plate NO <br /> Shoring NO <br /> Fire Extinguishers YES <br /> Warning signs YES <br /> RISK ASSESSMENT <br /> Risk of fine or ex losion is present, mandatory that all 2ossible <br /> sources of heat or ignition are k2Rt away from the work area-.-The— <br /> ga ice Presents a cold exposure when handling. <br /> EXPOSURE MONITORING PLAN <br /> Environmental exposure will be monitored periodically using a hand <br /> held LEL/02 meter. Personal exposure monitoring (in addition to <br /> the required annual check-up) will not be conducted. All personnel <br /> have been approved for respirator use. <br /> All POST personnel have current 40 hour OSHA certification. <br /> WORD SONES AND SECURITY NZASURES <br /> Site access is restricted through appropriate fencing and/or <br /> barricades. <br /> 4 <br />