My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1985-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
BILLING 1985-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:09 AM
Creation date
11/6/2018 9:53:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1985-1995
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\7647\PR0231227\BILLING 1985-1995 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD ; <br /> : ACU <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B 1 <br /> 1 <br /> 9 , <br /> 1� <br /> ' Cit If tlN r,f. <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> EMARKNLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> EM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE �L I 8 TANK REMOVED <br /> FACILITY NAME WHERE TANK IS INSTALLED. Q f L ��L C � < ! / L• L'� T <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: �► V1 <br /> L/Z 3. D+U YL ) <br /> C. DATE INSTALLED(MOIDAYNEAR) D. TANK CAPACITY IN GALLONS! <br /> vad-4W <br /> II.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> ❑ la REGULAR <br /> UNLEADED ❑ 3 DIESEL C I 6 AVIATION GAS <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. 4 GASAHOL <br /> 1 PRODUCT ibPREUM A ❑ F-] 7 METHANOL <br /> ❑ 2 PETROLEUM � 80 EMPTY UNLED D 5 JET FUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER {DESCRIBE IN ITEM D. BELOW) <br /> 0. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III, TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> ❑ <br /> A. TYPE OF 99 OTHER 1 DOUBLE WALL F73 SINGLE WALL WITH EXTERIOR LINER El 95 UNKNOWN <br /> SYSTEM � P SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANKF-:] 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM E] 6 100% METHANOL COMPATIBLE WFFRP <br /> MATERIAL ❑ 5 CONCRETE <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING �- <br /> IS LINING MATERIAL COMPATIBLE WITH 100Yk METHANOL? YES_ NO— <br /> D,CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL <br /> SPILL CONTAINMENT INSTALLED(YEAR) K epi OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) L*p H <br /> IV,PIPING INFORMATION CIRCLE A IFABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A& 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A,�U�1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH AID 95 UNKNOWN A U 99 OTHER <br /> IL`!i' <br /> C. MATERIAL AND A 1 RARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100%. METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TGHTNESS TESTING ❑ 9 MONITORING ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING E:] 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING F-17 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI,TANK CLOSURE INFORMATION <br /> I.ESTIMATED DATE LAST USED(MOIDAY(YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS I INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANT'S NAME q r � DATEr Q <br /> (PRINTED&SIGNATURE) ��IS �[( <br /> G r <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> CIlv� COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# n] 'Z (� <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B {7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORfl9t34B-RS <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.