Laserfiche WebLink
� , .'� Page 2 of 2 <br /> The boring is scheduled for Monday February 25 at 12:00, with sample collection shortly thereafter <br /> (30 minutes or so). Let me know if this does not work with your schedule. <br /> Sincerely, <br /> Richard Vogl, PG, CHG, CEG <br /> Principal Hydrogeologist <br /> GeoHydrologc Consultants, Inc <br /> 5912 Bolsa Avenue, Suite 200 <br /> Huntington Beach, CA 92649 <br /> Phone (714)898-5727 <br /> Fax (714)898-5701 <br /> Cell (714) 615-0585 <br /> http://www.gpQhydra.logic.com <br /> 2/22/2008 <br />