My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
REMOVAL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:31 AM
Creation date
11/6/2018 9:55:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2007
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\7647\PR0231227\REMOVAL 2007 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6eoHydrologic Consultants, Inc. <br /> because well VW-3 (due to its close proximity to vapor well VW-2-S/VW-2-D),would <br /> capture any residual hydrocarbon vapors from the area of former well VW-2-SNW-2-D. <br /> The wells were re-drilled in the backfilled former UST excavation area to their same total <br /> depths of approximately 36 feet, 58 feet, and 73 feet bgs for VW-3, MW-11, and MW-12, <br /> respectively. The screened intervals were from 26 feet to 36 feet(10 feet)and 38 feet to <br /> 58 feet bgs(20 feet), respectively for VW-3 and MW-11 and 68 feet to 73 feet bgs (5 <br /> feet)for MW-12. Wells VW-3 and MW-11 were constructed with 2-inch diameter <br /> schedule 40 PVC with 0.010-inch slotted screens and well MW-12 was constructed with <br /> 4-inch diameter schedule 40 PVC with 0.010-inch slotted screen. <br /> For MW-12, a#2/12 sand pack was placed around the screen interval, with the sand pack <br /> extending from total depth to approximately 4 feet above the top of the screened interval <br /> (63 to 73 feet bgs),followed by a bentonite chip seal placed on top of the sand pack for a <br /> minimum of 3 feet thickness and hydrated, bentonite grout was placed to within 2 feet of <br /> the ground surface, and the well was finished with 12-inch diameter locking monument <br /> style well box set in 2 foot of concrete. For MW-11, a#2/12 sand pack was placed <br /> around the screen interval, with the sand pack extending from total depth to <br /> approximately 4 feet above the top of the screened interval (37.5 to 58 feet bgs), a <br /> bentonite chip seal was placed on top of the sand pack for a minimum of 3 feet thickness <br /> and hydrated, bentonite grout was placed to within 2 feet of the ground surface, and the <br /> well was finished with 12-inch diameter monument style locking well box set in 2 foot of <br /> concrete. Well VW-3 had a#2/12 sand pack placed around the screen interval,with the <br /> sand pack extending from total depth to approximately 1.5 feet above the top of the <br /> screened interval (24.5 to 36 feet bgs), a bentonite chip seal was placed on top of the sand <br /> pack for a minimum of 3 feet thickness and hydrated, bentonite grout was placed to <br /> within 2 feet of the ground surface, and the well was finished with 12-inch diameter <br /> monument style locking well box set in 2 foot of concrete. <br /> Well installation boring logs are attached in Appendix E. <br /> 3.6 Reconnection of Remediation System Piping <br /> After UST removal activities and replacement well installation, new wells MW-11, MW_ <br /> 12, and VW-3 were reconnected and plumbed above grade back to the remediation <br /> system by Tafoya. Other existing wells which were connected to the remediation system <br /> (where piping crossed in the UST excavation)were reconnected below grade prior to <br /> backfill of the excavation. Vapor lines to VW-2 (s,d)were stubbed up and capped at the <br /> edge of the excavation for potential future use. An as-built of the piping layout and <br /> photographs showing relocated piping to newly installed wells MW-11, MW-12, and <br /> VW-3 and to the remediation system are located in Appendix F. <br /> TOC 172 UST Removal Report Final Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.