Laserfiche WebLink
• Page 2 August 21, 2006 <br /> POTENTIAL WORKER HAZARDS: <br /> Fuel contaminated soil may release volatile components to the atmosphere. Benzene and toluene <br /> are proposition 65 chemicals. <br /> POTENTIAL PHYSICAL HAZARDS ONSITE: <br /> Those common to construction. Slips, trips, and falls.Working around an open manways <br /> OVERALL HAZARD ESTIMATION: Moderate <br /> REQUIRED PERSONAL PROTECTIVE EQUIPMENT (optional as noted <br /> THE FOLLOWING LEVELS OF PERSONAL PROTECTION HAVE BEEN DESIGNATED <br /> NOTE: No eating, drinking or smoking is allowed in work area <br /> LEVEL OF PROTECTION Level D-Hard hat, safety glasses, <br /> steel toed boots,work gloves. <br /> Location (s)to be used At project site <br /> When to use: AT ALL TIMES <br /> LEVEL OF PROTECTION: Level C—Same as level D with addition of <br /> Tyvek and'/2 face respirator with OV cartridge <br /> Location (s)to be used At excavation location <br /> When to use_ When air monitoring requires <br /> DECONTAMINATION EQUIPMENT: Shovels, brooms, brushes, rags and water <br /> DISPOSAL OF CONTAMINATED MATERIALS AND IOR EQUIPMENT: <br /> MATERIAL TO BE PLACES IN 55 GALLON OPEN TOP DRUMS <br /> MONITORING: <br /> 1. Direct Reading Monitoring Equipment(Draeger tubes, LEL Hnu <br /> Equipment: LEL 02 <br /> Location to be used: Breathing zones adjacent to excavation <br /> And stock piles. <br /> When to be used: During excavation and treatment of <br /> Soils. <br /> 2 Action levels for Monitoring Results: <br /> Equipment: LEL, 02 <br /> Action Level: 5%of LEL, 19.8%of 02 <br /> Action, type and duration. Evacuate area and move to upwind location <br /> until the conditions improve. <br /> 3 Medical Monitorin : Contractors personnel has undergone rigorous <br />