Laserfiche WebLink
Monitoring System Certification <br /> Site Address: 7647 PACIFIC AVE Date of Testing/Service: 03/09/2006 <br /> F. In-Tank Gauging /SIR Equipment Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑NoHas all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No` Was accuracy of system product level readings tested? <br /> E]Yes 1:1 N, Was accuracy of system water level readings tested? <br /> ❑Yes FINo' Were all probes reinstalled properly? <br /> I—I Yes No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : [] Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No" ❑NIA Check all that apply)Simulated leak rate: ❑X 3 g.p.h ❑0.i g.p.h ❑0.2 g.p.h <br /> �x Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> M Yes ❑No' Was the testing apparatus properly calibrated? <br /> E Yes ❑No• ❑NIA For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 1-1 Yes ❑No N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No` 0 NIA I For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ElYes ❑No` 0 NIA For electronic LLDs,does the turbine automatically shutoff if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No" 0 NIA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Yes ❑No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Rage 3 of 3 Based on CA form dated 03101 <br />