EHD Program Facility Records by Street Name
>
P
>
PARK
>
224
>
2300 - Underground Storage Tank Program
>
PR0526575
>
REMOVAL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:27 AM
Creation date
11/6/2018 10:09:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1988
RECORD_ID
PR0526575
PE
2381
FACILITY_ID
FA0001074
FACILITY_NAME
QUIK MART LIQUORS
STREET_NUMBER
224
STREET_NAME
PARK
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21938106
CURRENT_STATUS
02
SITE_LOCATION
224 PARK AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PARK\224\PR0526575\1988 REMOVAL .PDF
QuestysFileName
1988 REMOVAL
QuestysRecordDate
8/15/2016 9:20:59 PM
QuestysRecordID
3167513
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS <br /> 1 ) All samples must be taken by a representative of a state cert- <br /> ified lab . <br /> 2% All solids, residuals, sludges, etc. that cannot be reused as <br /> motor vehicle fuel are to be removed, handled, transported, dis- <br /> posed of as hazardous waste. A copy of the hazardous waste manifest <br /> is to be submitted to this office within 30 days of tank removal . <br /> 3 ) Submit receipt for final tank destination within 30 days of tank <br /> mova1 . <br /> 9 ) Obtain all necessary fire permits (with proof of permit on site <br /> time of removal ) prior to scheduling appointment with S .J.L. H.D. <br /> r <br /> r <br /> 5 ) Schedule all appointments vith S.J.L.H.D. at least 48 hours in <br /> vance . <br /> 6)i) Removal must take place within 60 days of approval date on plan <br /> �or� plan must be resubmitted with fees . <br /> 7 ) If water is encountered, water sample shall be obtained. <br /> Soil samples to be analyzed for : <br /> TPH-G GC-FID ( 5030 ) <br /> BTX&E ( 8020 ) <br /> EDB <br /> TEL ( IF REPORTED AS TOTAL LEAD <br /> WILL ASSUME TO BE TEL UN- <br /> LESS BACKGROUND ANALYZED ) <br /> —�i•;"'+�.'�y:•:9 a.-'�.. "a�`i'�.:f.1Tl!�' �".Y .+_.;.....:... �.\ ., ._ ._ .. _ _.. Cit",.`.. .. ";',� :. .. <br />