| 
								           												U   																									I  																	©   PIPING    INSTALLATION    NOTES: 	®   PIPING    INSTALLATION    NOTES:
<br />																																																									15   CONTRACTOR SHALL PATCH AND/OR REPAIR EXISTING A.0 PAVING  		ALL CGIISTRUMM IS E>OSIM AND TO REMAN UNLESS N070
<br />    				UNAUTHORIZED CHANGES AND USES:   The engineer preparing these 																																										AND CONCRETE AS REQUIRED BY NEW WORK.  ALL WORK SHALL      		Off'
<br />    				plana will not be resp.   Ible for, or Ii       for unauthorized
<br />   				for, unauthorized than   a to or uses of th  a plans.   All changes    																							I  																		CONFORM TO ARCO SPECIFICATIONS. ypjE„T'Q						INE CON•IRAC7GIt SHALL MAINTAIN AND PROJECT E70SRNG
<br />    				plana must unauthorized d  writs g and must   ne app  ve i  by the pchan er 																																										��"� SHALL SLURRY SEAL AND RESIRPE ENTIRE SI7E			CANOPY allW S. FOGIM AND SHROUD FINISHES N PLACE
<br />    				of these plans.       																																																		AREA UPON OOIIPlETiON OF WORK. SLURRY SEAL SHAM- BE
<br />																																																										SCHEDULED TO BE FAD 3T1 DAYS AFTER COAtPLEROFI OF     		THE CONTRACTOR SHALL REPAIR OR REPLACE CANOPY
<br />    				conatro.tio[' cohiraoio  agrees that In accordance with g     ally     																																										WORK. 1HE STAl10N WAL REMAN N OPERATION BY STAGING THE   		RANWAiER LEADER     DAMAGED BY ISLAND RElIWVAL, SEE SHEET
<br />    				accepted construction practices, construction contractor will be     																								I    																																�'AT—i' 	�'
<br />    				required to assume   ole and complete responsibitiy for job site    																																											K"
<br />    				conditions during the course of construction of this project,
<br />    				Including safety of   it persons and property, that this requirement   																																									16   RECONNECT CANOPY DOWNSPOUTS AS REQUIRED BY NEW WORK.     		VAPOR AND VENT PNRIfi IS lb Si-OPE AT /      PER F00 •   		.�  >C, 		O
<br />    				shall in  made fo gpply continuously and no} limited to normal 																																																									$NINON PIPING IS TO SLOPE 1/4e PER FOOT. 						�  	Z
<br />    				working hours, an   construction contractor further agrees to       																																																																							�"
<br /> 																																																																																									co
<br />    				defend, idemnify and hold design professional harmless from any      																																—  —  —  —  —  —  —  —  -    17   CONTRACTOR SHALL INSTALL NEW TWO-POINT, 4" FILL AND     																			L
<br />    				and all liability, r4al or alleged, to connection with the performance																								-_  —  —  —  —  —  —  —      									STAGE I VAPOR RECOVERY SYSTEM. REPLACE EXISTING RISERS			SECONDARY CONTAINMENT PMMtKi N SHOWN BY NOTE OIN.Y. NOT  	(�'�  	!�
<br />    				of work on this project, excepting liability arising from sole   																																											AND INSTALL ADDITIONAL HARDWARE AND FITTINGS AS REQUIRED.   		ORAPFIL"ALLY. ALL PRODUCT PIPMW TO BE DOUBLE CONTAINMENT  	/�"�    O  	0  U)
<br />    				negligence of design professional.   															❑       ❑     !F::-Ijl      ,
<br />																																																										TYPICAL OF 4 TANKS. REFERENCE SHEET M-2.     					T M VAPOR RECOVERY AND VENT PIPING TO EE SNG E WALL      	ii.	_   �r    IEagtneen Note18   INSTALL NEW VEEDER—ROOT TLS-350 TANK MONITOR UNIT.      																E'"   •�  •	C
<br />    				the existence   nd location of any underground utilities,  pipes,       																																										LOCATE AS DIRECTED BY ARCO FIELD ENGINEER. i=  				ALL NEW PPNIG SHALL 8E INSTALLED PER MANUFACTURER'S
<br />    				and/or struct rsa shown on t     																																																														RECOMMEHDARONS AND NSTALLAIM 161RUCTION5  							(�
<br />    				search of are
<br />							table records.    o the begt.,of our knowledge, there      																													o  	0 	0 	0  	0		VEEDER-ROOT WAL PROVIDE P06171VE SHUT DDWN.																				/I 1
<br />    				are no of are g table
<br />								record    t as �howgE��}n fheae plane.   The 																												c=       																											CONTRACTOR SHALL USE flElOfl1E CONNECTORS FROM THE TAW			LLI
<br />    				contractor s all ascertain t e true vartl     and horizontal location   																																									19   CONNECT NEW 2" SINGLE WALL FIBERGLASS VENT PIPING FROM       		SUMP TO THE VAPOR RECOVERY MANIFOLD. MAN PRODUCT LINES
<br />     				and size of those to be    ed of any u    rground utiliftea and      																																										TANK FIELD TO EXISTING VENT PIPING.   							AND SIPHON PIPING SHAD  PROVIDE AT LEAST FOUR (4) FEET OF
<br />     				ahau size
<br /> 						re ponetble for   ny damage to any public or iesprivaten 																																																									SiRAKIHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF       		Q   C    G  f
<br />     				utilities, shown or not s own hereon.
<br />   							IMPOR ANT NOTICE    																																														©0   INSTALL NEW 4'x7', STEEL-FORMED, CONCRETE DISPENSER      			MORE THAN 30 OEGI:EEs.  								-1�+co   0   N 	u
<br />  						/
<br />    						Section 42t /4217 of ens Government code requires  																																												ISLAND, TYPICAL OF 4.  REFERENCE DETAIL 1, SHEET CAI-1.   		O  MODIFY TANK SUMP TO PROVIDE WATERTIGHT TESTING AND    		e       C   IC
<br />    						a DI  Alert dentifka.on Number be issued before a    																																																										SECONDARY CONTAINMENT TESTING TO COMPLY WITH  SB 969 		`� 		�'  '^
<br />       					I   Permit le    donate will be valid. For your Dig Alert    																																											21   PROVIDE AND INSTALL NEW CONDUITS FOR UNDER DISPENSER  																=   �  		�Y
<br />    						ID Numb   call    																																																	CONTAINMENT SENSORS TO NEW VEEDER ROOT TLS-350 MONITOR   		REQUIREMENTS.  REMOVE AND OR REPLACE PIPING BOOT FITTINGS    		5 AS NEEDED.  TYPICAL OF 8 SUMPS.       							j5
<br />   																																																																																							•GO  	(0
<br />     						UNDE GROUND SERVICE ALERT      															O5 -																																																											0  	W
<br />    							-800-227-2600770
<br />    						For• n												_�derground Locating. 2 working days before you dig.			—  — 	—  —  —  —  — 		—  -      		�� � 																								©  NOT USED   											O  CONSTRUCT NEW CONCRETE SLAB OVER  TANKS AS REQUIRED BY   	O	Q  	T
<br />  																										®     						\      																																						NEW WORK.  SET MANHOLE COVERS i-1/2" ABOVE SLAB. SEE						I
<br /> 																																																										PROTECT EXISTING OBSERVATION/INSPECTION WELL IN PLACE AS     		DETAIL SHEET M3-5.    											•  	CO
<br />  																																	\    \  																							SHOWN.
<br />   																															.`      																																							O3       										PER       					0
<br />    																																																																								INSTALL 3" SINGLE WALL, STAGE II VAPOR RECOVERY HEADER     					N
<br />      																	TOTAL  AREA  =   1 ,923  S.F.      										\\\ ,\																					®  REUSE EXISTING 2"0 TANK VENT LINES. SLOPE 1/8" PER FOOT,       		FOOT FOR "BALANCE"
<br />     																																																																									MINIMUM, TOPTANKSOR     CSEERDETAILS ANDY SYSTEM.   LSECTOPE IONS, SHEET    			C  	O
<br />  																																																										MINIMUM, BACK TO TANKS.   																						O
<br />    																																																																								TK3-3.
<br />      				/       											I    							® 		❑   									-•�       			O   																INSTALL©  BUILDINGNEW EXTERORFILL ALARM AS SHOWN.AND ACKNOWLEDGMENT SWITCH ON  	®  INSTALL TWO. 2" DOUBLE WALL, PRODUCT LINES. LINES TO BE     	�+
<br />      																																				C      																																																		e.
<br />    																																																																								EQUIPPED WITH  LEAK MONITOR IN PIPING SUMP,  ATTACHED TO     	(� 	L•i
<br />  																																																										INSTALL NEW EMERGENCY SHUT OFF SWITCH  AT BUILDING       			TANK.  LEAK MONITOR WIRED FOR TURBINE SHUT DOWN. SEE		—Q
<br />    						0  	0  	o																																														EXTERIOR.  SURFACE MOUNT AT 42"  ABOVE SIDEWALK SURFACE.      		DRAWING TK4-2 FOR WIRING DIAGRAM.  SLOPE 1/8-INCH PERTO TANKS.										"
<br />  																																																										VERIFY LOCATION WITH  ARCO ENGINEER. 							FOOT,
<br />      																																																																									MI  IMUM, ARRANGEMENTEATETAIL TANK� PIPING0.       ESHALL BEFOR
<br />    																																																																								INSTALLED PER MANUFACTURERS   RECOMMENDATIONS.
<br /> 																														.    'I   																									•															O5    MODIFY EXISTING TANK RISER VENTS TO MANIFOLDED  TO ONE PV
<br />       																														pp       											19  																													CAP.  SEE DETAIL 3 SHEET TK3-1.  REMOVE EXTRA VENT RISER.
<br />       																	SALES  AREA																																																				INSTALL EXTRACTOR FITTING ASSEMBLY FOR VENT AND STAGE II
<br />  																																						1     		III (  	0       												..      															VAPOR RECOVERY. SEE SHEET TK-2 AND TK3-1.
<br />     																																																																								SEE DRAWING TK4-2 FOR MONITORING CONDUIT DETAILS.
<br />     																																																																							®  BACKFILL AND  COMPACT TANK EXCAVATION IN ACCORDANCE WITH
<br />  																														,o																																										ARCO SPECIFICATIONS. PATCH  AND/OR REPLACE A.C. PAVING TO
<br />    																																							r.   O    .I   	`     																													MATCH EXISTING. 										O
<br />  																													%_       																		1
<br />     																																																																							O  	-
<br />   																																		'  																																									DISPENSERS, TO BERFETTED WITH WITH BALANCER
<br /> 																																				��   																																				INSTALL FOUR (4) W
<br />     																																																																								MULTI  PRODUCT DIS
<br />    																																																																																			UNDER
<br />																				,•.,,, : : .   :  .,:.       							6      		::;.��. -.  					'
<br />      																																																																								DISPENSER CONTANMENTcd
<br />     																																																																								STAGE 11 HOSES AND     2NCLUDINGAPRODUCTVAND VAPOR SHEAR
<br />   																																																																																	-		-
<br />       																					. ' T2'  ""'  `,..` ...  "'• •.: :..;• '..` ::.       						-      � 			I,  . .�: ; "...;    '  														�/      															VALVES AND 3M INTERCOM. SEE DRAWINGS TK3  3 AND TK3  4
<br />																																													3   																											FOR TYPICAL INSTALLATION DETAILS  SEE DRAWING TK4  1  FOR
<br />      																																																																								DISPENSER WIRING DIAGRAM.  START UP BY MANUFACTURER'S
<br />																																																							OREPRESENTATIVE. CONTRACTOR TO PURGE LINES WITH MINIMUMO
<br />   				O    																	8792  	- - 													..       			TJ    																													200 GALLONS PER HOSE.  ANY AIR POCKETS OR START—UP
<br />   																													11      		&17PIPING     LEGEND       							PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT
<br />       																		o   																																																											ON
<br />     																							EJ     		°    I     ..  																																												THETO
<br />      																																																																								WRINCON A CONTRACTOR. NOTET DESTROYS ETHATR  PING TOLTHE DISPENSERS BE BILLED 	MUST
<br />       																	..    				�'    			o   									! Y  		L.I`. ,�.       																															ALWAYS BEINSTALLEDTO THE PB"NSIDELOF THE DISPENSER  TO
<br />     																		.o     														.. .  	.�, ' ®     tf   			i ,...  																			gam_      2"  F.G.  DOUBLE  WALL
<br />   																																						�.     														O
<br />   																					EJ      					I												1'•   ""     																								PRODUCT PIPING  				ENSURE PROPER MOUNTING TO THE UNDER DISPENSER
<br />       																																																																																					C
<br />      																	:     	I       			2110  9     																										O   						--    												CONTAINMENT SUMP.  									•^
<br />    																											I',. . 								-  																																																		O
<br />  																																																												-    	-----   			.  SINGLE
<br />     																		-' 7'  			22'    			9'	':r  								,. .. .. 																							—3"VR—			2„  OR  3"  F.G
<br />  																																																																	WALL VAPOR  RECOVERY      	10   INSTALL DISPENSER SUMP MONITORS,  TYPICAL OF 4.     				�
<br />      																					20
<br />    				_ 																		38' 				I. '     											j. `.       :•     :' :   +`       																					PIPING   					11   INSTALL NEW ISLAND BUMPER POST, TYPICAL OF 4.  SEE DETAIL     		N       	C
<br />   				,j    										CO 																					®     SP 1      ®-   									O								—       —       —       —      2"  F.G.  SINGLE  WALL  		O       																LTf
<br />  				Cvl																										15    			\/'  																														VENT PIPING					6, SHEET CA1-1.       									'�
<br />      				•     														I     	ACANOPY   			'�•    :, 						..    																									—G—  —  —  —      EXISTING  UNDERGROUND      	12   CONTRACTOR SHALL CONSTRUCT NEW 6" THICK CONCRETE SLAB     		C    		m
<br />   																					zs'-sex 63'       	16       	i     																																					UTILITIES  (WATER,  GAS)       		WITH  $3 REBAR  AT 18" O.C.,  EACH WAY, OVER  4"  AGGREGATE       		O
<br />  				v      																							'i	...  .  ..  .       			�.  ...... ..'       																																			BASE
<br />																		..   	I       															--- -- - --
<br />    				• 													... .. ..       	---3'�e7 --    --    -   				---     	S7      																														NEW CONCRETE
<br />       																																																0     																																							ao
<br /> 																																			..  .. 																																																		i    			o
<br /> 																							g2     				i:i   ..:...:i::  ........  .. ..       			( :      																																		13   NOT USED
<br /> 																																																																																							r+    		U
<br />       																		o      				EJ   			.   . ...... .........  ....._.. ...     																																NEW A.C.  PAVING  																		+-'
<br />  																																					.... .. .. .... .. ...... ..................
<br />      																		. a     							o  																				O     																							14   CONTRACTOR SHALL PROVIDE PERFORMANCE INSPECTION OF   			E>,    		v
<br />     																					EJ       									4      																																								EXISTING TANK TURBINES AND EVALUATE REPLACEMENT OR   		C 	Q	iC
<br />																			.7,.  			2?.	2 .      	, .9'::,. ,.. :::  																																												UPGRADE WITH  ARCO ENGINEER.    											0
<br /> 																																																											TANK     ELEVATION : 																						U       i2
<br />																							Vi       																																																																		.12
<br />  																							e'.,.:'..:: .., .    ..       																																																											Q Ln   >:       O
<br />   																																																																	EXISTING.       																				Cd
<br /> 																																																																																						(n
<br />  																																																																																										tQ�
<br />    																																																																																								N N	6
<br />																																																																																									Y
<br />     																																																																																							Zt�y Vrrn     X (i
<br />																																																																																						� kV > U	y
<br />  																						P.L.   =   250.00'       																																																												N
<br />     																																																																																							Q c_ Cow
<br />    																																																																																									M M
<br /> 																																																																																								jN ON    	r0
<br /> 																																																																																								you^^2�2
<br />     																																																																																							r2p a) can
<br />     																																																																																							F V    Kv
<br />																																																																																						mos er  release  date
<br />																																																																				NO.     DATE       		REVISIONS  						PROJECT RELEASE   	proj.  exe.	drown  by
<br />																																																																																						11/08/01	DBS
<br />  																																																																																	PERMIT
<br />																																																													GRAPHIC SCALE     																			project  /  facility
<br />  																																																																																	BID      					6100
<br />       																																																												t0  		9	5       1
<br />  																																																																																	CONST.    			sheet  /  file
<br />      																																																														( IN FEET)																							TK-1
<br />  																																																														I inch a 10 feet
<br />  																																																																																	AS—BUILT						of
<br />       																																																																																			ARCO/AR1402/TK-1.DWG
<br />
								 |