My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
9631
>
2300 - Underground Storage Tank Program
>
PR0503889
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 7:59:12 AM
Creation date
11/6/2018 10:13:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503889
PE
2332
FACILITY_ID
FA0006006
FACILITY_NAME
NAKAMURA, HARRY
STREET_NUMBER
9631
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
9631 E PELTIER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PELTIER\9631\PR0503889\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
10/17/2017 3:30:30 PM
QuestysRecordID
3683985
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1 . <br /> • <br /> STATEOFCAUFORNIA ��b��" °>: <br /> STATE WATER RESOURCES CONTROL BOARD i '; <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B "�� U: <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. c""°""�� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT F-14 AMENDED PERMIT E] 9 TEMPORARY TANK CLOSURE dB TANK REMOVED O <br /> OBA OR FACILITY NAME WHERE TANK IS INSTALLED: & 3 ', <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK 1.0.a B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) u� D. TANK CAPACITY IN GALLONS: �Q <br /> II.TANKC EMS IFA-7 IS MARKED,COMPLETE ITEM C. <br /> A. 7 MOTOR VEHICLE FUEL ❑ d OIL B. C. ❑ laREGULAR 3 DIESEL <br /> UNLEADED 6 AVIATION GAS <br /> 2 PETROLEUM 80 EMPTY 7 PROWCT ❑ IDPREMIUM d GASAHOL T METHANOL <br /> UNLEADED 5 JETFUEL <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.a <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALLT14ATAPPLIES IN BOXD <br /> A. TYPEOF ❑ 1 DOUBLE WALL E] 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE I�I 7 ALPMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PdmaryTaak) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL [1?-f6UUNKNOWN ❑ w OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING 3 EPyXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR <br /> LINING ❑ 5 GLASS LINING F-1U6 UNLINED ^ 955 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL 7 YES_ RO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 MNYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION O 91 NONE 95 UNKNOWN O 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 ST L W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION U 5 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 7 AUTOMATIC LINE LEAKOETECTOR ❑ 2 LINE TIGHTNESS TESTING INT ST IAL99 OTHER <br /> MONITORING ❑ <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION I:j 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE O 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION n, pp�� <br /> 1.ESTIMA4D DAT LAST US�(MO/DAVA'R) 2. SUBESTSTANCEMATED REMAININGmoi'/ GALLONS 3 WAS TAN MATEDWII7H YES NO IJP <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED A SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE 101COUNTY# JURISDICTION# FAC TANK# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (s90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORMA,UNLESS A CURRENT FORMA HAS BEEN FILED. <br /> fOPa9NB' <br /> 0 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.