My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2003 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
BILLING 2003 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 12:02:16 PM
Creation date
11/6/2018 10:18:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2003 - 2014
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\4445\PR0231785\BILLING\BILLING 2003 - 2014 .PDF
QuestysFileName
BILLING 2003 - 2014
QuestysRecordDate
8/30/2016 9:49:09 PM
QuestysRecordID
3179084
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ❑ 1,NEW PLAN AW.CHANGE OF INFORMATION Mot <br /> PLAN TYPE MONITORING IS IDENTICAL.FOR ALL USTs AT THIS FACLIIY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THF FOLLOWING UST SYSTF.M(S). <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME M63 <br /> FACILITY SITE ADDRESS L (�t-{ j `✓%l, M0'' CITY �;�C.K - H Mos. <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)be performed in Mo6. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY ❑ 99.OTHER(Specify): Met <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> rM1�ONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MLI. <br /> PANEL MANUFACTURER: 131poilt, Cf PQS M12_ MODEL#: M13. <br /> LEAK SENSOR MANUFACTURER: '/,� � M14, MODEL#(S): MI5. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYS TO MON? OR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MM <br /> IN-TANK PROBE MANUFACTURER: MIS. MODEL#(S):JC?4 u -307- M19. <br /> LEAK TEST FREQUENCY' ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY M2p <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): WI <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24, <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 ` <br /> TEST FREQUENCY: ❑ a.ANNUALLY [Ib.BIENNIALLY c.OTHER(Specify)' gtA,� M26. M27 <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requna ageney.ppnval) <br /> ❑ <br /> 99.OTHER(Specify): We <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> tft 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SY RENCH(ES)AND OTHER SECONDARY CONTAINMENT q <br /> SECONDARY CONTAINMENT IS: 'l" a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M3L <br /> PANEL MANUFACTURER: M32. MODEL#: -7 y,-;'��'D `7d C L M33. <br /> LEAK SENSOR MANUFACTURER: it, 2 c,n .P air, - M34. MODEL#(S): M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? 0 a.YES ❑ b.NO M36. <br /> WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? IM a.YES ❑ b.NO M37 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MILD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): Mag MODEL#(S): M39. <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS !� <br /> ELLD MANUFACTURER: M40 MODEL#: f'S qT N Mat <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2&p.h. ❑ b.MINIMUM ANNUAL 0.1&p.h. M42rn - <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? 4' a.YES ❑ b.NO M43_ <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? 19 a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46 <br /> r . <br /> AVISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY' VI C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED'' Mn. <br /> "Requires rgen,,spprod ""Allowed for mnnoonng efwbuned emer8mcy gmentor fuel piping only per MC§25281.5(6)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mos. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.