My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4445
>
2300 - Underground Storage Tank Program
>
PR0231785
>
COMPLIANCE INFO 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:19 AM
Creation date
11/6/2018 10:18:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015
RECORD_ID
PR0231785
PE
2361
FACILITY_ID
FA0003994
FACILITY_NAME
PERSHING GAS FOR LESS
STREET_NUMBER
4445
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11018006
CURRENT_STATUS
01
SITE_LOCATION
4445 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\4445\PR0231785\COMPLIANCE INFO\COMPLIANCE INFO 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
8/29/2016 4:45:37 PM
QuestysRecordID
3177600
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard i Professional Engineer <br />❑ Other (Specify) APR 14 2015 <br />Test Method Used: X Pressure ❑ Vacuum Ll Hydrostatic <br />11 Other (Spec) ENVIRONMENTA <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping, Run # I Piping Run # 2 <br />Equipment Resolution!417M79 psyloqu <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />Fiberglass Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Ameron Ameron <br />Ameron <br />Piping Diameter: <br />3" 3" <br />3" <br />Length of Piping Run: <br />Approx. 80' Approx. 90' <br />Approx. 70' <br />Product Stored: <br />Super 91 Diesel <br />Regular 87 <br />Method and location of <br />piping -run isolation: <br />Test boot at STP Test boot at STP <br />Piping Sump #1 Piping Sump #2 <br />Test boot at STP <br />Piping Sump #3 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes 10 Minutes <br />10 Minutes <br />Test Start Time: <br />8:50 --- 8:40 <br />9:00 <br />Initial Reading (R,): <br />3 Psi 3 Psi <br />3 Psi <br />Test End Time: <br />9:50 9:40 <br />10:00 <br />Final Reading (Rr): <br />3 Psi 3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour 1 Hour <br />1 Hour <br />Change in Reading (RP -R,): <br />0 Psi 0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi No Loss in PsiNo <br />Loss in Psi <br />Test Result: <br />Pass Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.