Laserfiche WebLink
r <br /> UNDERGROU`(D STORAGE TANK MONwI'ORING PLAN <br /> For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 23 CCR, Sections 2632(d)(1), 2634(d)(2), and 2641(h) <br /> Mol. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moz. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - <br /> FACILITY NAME 7-Eleven#17334 Moa. <br /> FACILITY SITE ADDRESS 4501 N. Pershing Mao CITY Stockton mos. <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be perfortned by qualified personnel. <br /> M07.MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY [199.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Haeardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.I INDER PRESSURE ❑ d.UNDER VACUUM MD. <br /> PANEL MANUFACTURER: VeederROot 2. MOD #: TLS350 M13. <br /> LEAK SENSOR MANUFACTURER: VBeerROot 14. MODE #(S): 794390-420 M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl <br /> PANEL MANUFACTURER: M6. MO L#: MIT <br /> IN-TANK PROBE MANUFACTURER: Is. M EL#(S): MM <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.D Y HTLY ❑ c.WEEKLY M2°. <br /> ❑ d.MONTHLY ❑ e.O (Specify): M21. <br /> PROGRAMMED TESTS: ❑ a. .h. ❑ b.0.2 .p.h. ❑ c.0 ER(Spmify): M22. Mz3. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a. AN L PER 23 CCR§26 ❑ b.STATISTICAL PER 23 CCR§2646.1 W4. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(M G)PE 23 CCR§2645 <br /> TESTING PERIO ❑ a.' HOU <br /> E] b.60 HOURS W5, <br /> E] 5.INTEGRITY TESTING ER 23 CCR§2643.1 <br /> TEST FREQUENC ❑ a.A UAL ❑ b.BIENNIALLY [I c.OTHER(Specify): M26. WT <br /> El NE: Ela.DAI Y ❑ b.WEEKLY(RNoim,8.,apprurnq <br /> ❑ 99.OTHER(Specify): Mza. <br /> V. PIPE MONITORING <br /> MONITORING S PERFORME USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> ® 1.CONTIN US ELECTR NIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECON ARY CON AINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL UFAC RER:VeederRoot M32. MODEL#: TLS350 MJ3- <br /> LEAKSENS M UFACTURER: VeederROot M34. MODEL#(S): 794380-352 W5. <br /> WILL A PIPIN AK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ® a.YES ❑ b.NO MDs. <br /> WILL FAILUR&DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO Mar. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s):Vaporless &Redlacket Mas. MODEL#(S): LD2000&FX1 V M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Moo. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURFIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ® 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ® a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY- ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED'" M47. <br /> •Requim as.,approwl "Allowed for monitoring of unburie i con tgency ge or fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mos. <br /> UN-022A-I/3 www.unldocs.org Rev.IOA4103 <br />